21.02.2023 Views

Eric Lee Selected Portfolio

  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

d - s n f

d - us n of

s.

s.

ERIC LEE

SELECTION OF PROFESSIONAL WORKS

LEED AP BD+C, WELL AP, ASSOC. AIA

151 EAST 81ST AP# 5A, NEW YORK

NY, 10028, USA +1 646 853 6672

Email: Eric_07091@hotmail.com

692 - 694 Broadway - Storefront Alteration - Feasibility Studies - Retail & Landmark - 12 Stories / New York, New York

Conceptual feasibility studies for storefront alteration / renovation for retail client on NY landmark high-rise.The original building is recognized as

a contributing landmark in NoHo district, several interations on storefront facade on Broadway were designed to seek for required LPC approval.

Responsible for producing multiple design options with accurate survey conducted on site, communication with client and landmark history research

and design study package preparation for internal and external reviews. Production of 3d models in Rhino and preparation of design presentations.

26 West 17th Street - Entrance Alteration - Retail & Landmark - 12 Stories / New York, New York

Located in Flatiron on 17th Street between the Fifth and Sixth Avenues, this individual landmark experienced entrance accessibility issue due to

existing main entrances to retail tenant blocked consistently by homeless individuals. Carefully designed entrance alteration with built-in shutter

enclosure was studied, presented and approved by client and landmark preservation commission (LPC NY) through a community board meeting,

LPC hearing and DOB permit set. Responsible for 3D design studies, presenation of options and final visulazation and CD detail documentaitons.

111 FIfth Avenue - Accessibility Improvement - Retail & Landmark - 13 Stories / New York, New York

Commissioned to work on proposed accessibility improvement to accomodate current ADA regulation from NY Building Code on prominant landmark

retail landmark building in flatiron district. Responsible for design option studies of altered entrance improvement through external and internal ramps,

new signage enclosure and visualization of proposed for client and landmark approval. Involvement: schematic design & design development phase.

8

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!