05.12.2023 Views

Bay Harbour: December 06, 2023

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>Bay</strong> <strong>Harbour</strong> News Wednesday <strong>December</strong> 6 <strong>2023</strong><br />

<br />

<br />

<br />

<br />

XMAS SUPER SALE<br />

10- 70% OFF ALL FOOTWEAR<br />

6<br />

NEWS<br />

ASICS KAYANO LITE 3 M+W<br />

WAS $300 SAVE $150<br />

NOW $150<br />

NEW BALANCE 624 M+W<br />

WAS $150 SAVE $50<br />

NOW $100<br />

MIZUNO RIDER 25 M+W<br />

WAS $260 SAVE $120<br />

NOW $140<br />

MERRELL MOAB VENT M<br />

WAS $260 SAVE $110<br />

NOW $150<br />

MERRELL KHALI SHAW W<br />

WAS $210 SAVE $70<br />

NOW $140<br />

NEW BALANCE ML327 M+W<br />

WAS $170 SAVE $100<br />

NOW $70<br />

HUGE RANGE OF KIDS SHOES<br />

INSTORE & ALL REDUCED<br />

CYCLE FORTH: The ribbon has been cut on the Puari ki Kahuhura<br />

Heathcote Expressway by Heathcote Ward councillor Sara Templeton<br />

and deputy mayor Pauline Cotter, alongside Tim Lindley, Paul McMahon,<br />

Callum Ward, Linwood Ward councillor Yani Johanson and pupils from Te<br />

Tihi o Kahukura Heathcote Valley School.<br />

PHOTO: NEWSLINE<br />

Cycleway from city to<br />

Heathcote now open<br />

A NEW section of the Heathcote cycleway<br />

is now open, from The Tannery to the<br />

Heathcote Valley.<br />

In a ribbon-cutting ceremony on Friday,<br />

the Puari ki Kahuhura Heathcote Expressway’s<br />

second section was opened.<br />

It runs from The Tannery along Cumnor<br />

Tce beside the Ōpāwaho Heathcote<br />

River, then onto Vaila Pl before cutting<br />

through Kennaway Reserve along State<br />

Highway 74.<br />

It then crosses Scruttons Rd before<br />

following the railway tracks past Ferrymead<br />

Heritage Park to Truscotts Rd and<br />

Martindales Rd.<br />

The first section of the cycleway, connecting<br />

the central city to The Tannery,<br />

opened in 2019.<br />

The new section includes a mix of pathway<br />

and boardwalks, as well as new fencing<br />

along the route, lighting for visibility<br />

and two new railway crossings.<br />

Said Heathcote councillor Sara Templeton:<br />

“I am so thrilled to see this cycleway<br />

open, it has been hugely anticipated by the<br />

local community and will provide another<br />

safe option for people to use.”<br />

The project cost $13.8 million with<br />

$8.2m from Rau Paenga through the<br />

Government’s shovel ready programme.<br />

SUMMER DISCOUNTS<br />

ON OUR OUTDOOR AWNINGS<br />

NEW BALANCE YP860P11<br />

WAS $140 SAVE $70<br />

NOW $70<br />

NEW BALANCE GESHAGP<br />

WAS $120 SAVE $80<br />

NOW $40<br />

ALL NB HOODIES NOW $40<br />

WERE UP<br />

TO $120<br />

30% OFF ALL SOCKS<br />

50% OFF ALL BACKPACKS<br />

Folding Arm, Straight Drop or Louvre Roofs<br />

Awnings are designed to provide<br />

convenience, comfort and shelter<br />

with automated solutions.<br />

We have a number of different styles<br />

to suit your needs and budget.<br />

Not only will these provide great<br />

shelter, but also make the place look<br />

vibrant and cosy, and to top it off<br />

THEY ARE NEW ZEALAND MADE!<br />

The system can be operated<br />

manually or controlled with a remote<br />

system, which makes it even more<br />

convenient and hassle-free.<br />

ASK ABOUT OUR NEW<br />

LOUVRE ROOF SYSTEMS!<br />

We come to you with<br />

our mobile service,<br />

or see us in-store.<br />

Free Measure & Quote<br />

<br />

99 Sawyers Arms Rd, Papanui<br />

Hours: Monday - Friday 9am - 5pm,<br />

Saturday 9am - 1pm<br />

Phone. 365 4666<br />

www.venluree.co.nz

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!