Techniche 5th issue (Read-Only) - College of Technology, Pantnagar
Techniche 5th issue (Read-Only) - College of Technology, Pantnagar
Techniche 5th issue (Read-Only) - College of Technology, Pantnagar
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Page 24<br />
architecture is likely to be very different from what we<br />
know today.<br />
At present quantum computers and quantum information<br />
technology remains in this pioneering stage. At<br />
this very moment obstacles are being surmounted that<br />
will provide the knowledge needed to trust quantum<br />
computers up to their rightful position as the fastest<br />
computational machines in existence. Quantum compu-<br />
BRIDGE THE GAP<br />
C<br />
onnections…. Bridging the Gap:<br />
Spending hours at CCF looking<br />
for different civil engineering<br />
activities across the globe, I had<br />
no idea that this would lead me to one <strong>of</strong> my best career<br />
experience so far.<br />
After winning the 3rd prize at “Coloseum-08” in I-<br />
Bridge, I was looking for an opportunity to do something,<br />
more thrilling and more challenging. So as I<br />
spotted the information about “Avishkar-2008”, my<br />
mind almost felt like- Yes! I got it! It was a three day<br />
national level technology festival organized by<br />
MNNIT Allahabad, encompassing<br />
an entire gamut <strong>of</strong> events that test<br />
our technical skills, thought process,<br />
technical knowledge as well as intellect<br />
as aspiring engineers. Our team<br />
including Vishal Chauhan, Nikhil<br />
Rastogi, Alok Mishra & me (all<br />
from IInd year Civil Engg.) registered<br />
for the event “Connection”.<br />
It was an on the spot event, where we had to design,<br />
estimate and build an economical, artistic model according<br />
to the given problem using different Aluminum<br />
Sections.<br />
After hard work <strong>of</strong> two nights, looking for different<br />
types <strong>of</strong> truss bridges & their properties, we decided to<br />
design a “through-howe truss bridge” as its strength for<br />
a given mass is good, number <strong>of</strong> compressive members<br />
is less and is more economical .<br />
When our proposed design was able to clear the online<br />
elimination round, we reached Allahabad to implement<br />
our plan in 3-D structure. On 18 th <strong>of</strong> September we<br />
constructed a 1.2m long, 20cm high bridge with a deck<br />
width <strong>of</strong> 20cm. It was divided into 6 parts<br />
(truss sections) with a 1:6 height: length<br />
ratio. In addition to basic structure, bracings<br />
were also provided for safety purpose.<br />
The bridge was constructed with<br />
the help <strong>of</strong> angle sections, T-sections, plate sections,<br />
bolts, etc. The time limit for the event was 7 hours, out<br />
<strong>of</strong> which we used 6 hours to finish our task.<br />
After a full working day, we answered various queries<br />
justifying our concept behind the constructed model in<br />
the viva round.<br />
Finally on 19 th September, the model was<br />
tested as per the judgment criteria which consisted<br />
<strong>of</strong> deflections <strong>of</strong> mid span, maximum<br />
load carrying capacity for 15mm<br />
deflection at mid span, economy <strong>of</strong><br />
construction and safety measures<br />
adopted.<br />
ing joint winners.<br />
Techtonic<br />
ters have their origins in highly specialized field <strong>of</strong><br />
theoretical physics, but its future lies in the pr<strong>of</strong>ound<br />
effect, it will have on mankind.<br />
Amit Burman<br />
I Year<br />
Electronics and Communication Engineering<br />
Finally our hard work paid <strong>of</strong>f as<br />
we found ourselves as the runner up<br />
<strong>of</strong> event with IIT K & MNNIT be-<br />
I congratulated my teammates for the success and<br />
would like to thank my H.O.D. Dr. P.S. Maher, Dr.<br />
Hansraj & Dr. Virendra Kumar for their encouragement<br />
& support.<br />
I hope this achievement will generate a zeal among the<br />
students for even better performances.<br />
Vikas Pamar<br />
II Year<br />
Civil Engineering