Crossrail Western <strong>Tunnels</strong> and Bond Street and<br />
Tottenham Court Road Stations, London<br />
United Kingdom<br />
General Data:<br />
Project: Crossrail Western <strong>Tunnels</strong> and<br />
Bond Street and<br />
Tottenham Court Road Stations,<br />
single-track railway<br />
Client: Crossrail Limited, London, UK<br />
Contractor: <strong>Wayss</strong> & <strong>Freytag</strong> <strong>Ingenieurbau</strong> <strong>AG</strong><br />
in a joint venture<br />
Construction period: February 2011 to July 2015<br />
Construction costs: € 505 million<br />
Technical Data:<br />
Scope of work:<br />
Contract C300: Construction of 2 parallel, singletrack<br />
railway tunnels, length: 5.9 km<br />
each, internal diameter: 6.20 m;<br />
6 cross-passages; construction of<br />
Fisher Street Shaft and Crossover<br />
Contract C410: Construction of Bond Street and<br />
Tottenham Court Stations<br />
Construction method: Construction of the tunnels using 2<br />
EPB shields, shield diameter: 7.10 m;<br />
construction of stations using the<br />
sprayed concrete lining (SCL)<br />
method; construction of Fisher Street<br />
Shaft and Crossover using NATM<br />
techniques with a sprayed concrete<br />
inner lining<br />
Geology: London Clay<br />
24|25