Cologne North-South Light Railway, Southern Section<br />

Germany<br />

General Data:<br />

Project: Cologne North-South Light Railway, Southern Section,<br />

single-track metro tunnel<br />

Client: Kölner Verkehrsbetriebe <strong>AG</strong>, Cologne<br />

Contractor: <strong>Wayss</strong> & <strong>Freytag</strong> <strong>Ingenieurbau</strong> <strong>AG</strong> in a joint venture<br />

Construction period: November 2003 to mid-2012<br />

Construction costs: € 470 million<br />

Technical Data:<br />

Scope of work: 3,260 m of light railway line with 2 single-track tunnels, total length: 5,400 m,<br />

internal diameter: 7.30 m; 7 stations; 1 crossover; 1 weaving section<br />

Construction method: TBM tunnelling using 2 Mixshields (slurry shields), shield diameter: 8.39 m,<br />

segmental lining; use of complex special construction methods, e.g. ground<br />

freezing, soil stabilisation (jet grouting and compaction grouting), groundwater<br />

lowering, compressed air tunnelling using ground freezing methods and pipe<br />

umbrella support systems<br />

Geology: Quaternary sands/gravels Brandkopf/Lohmeberg <strong>Tunnels</strong><br />

Germany<br />

General Data:<br />

Project: German Unity Transport Project VDE 8, Upgraded and New Railway Lines between<br />

Nuremberg and Berlin (Nuremberg-Ebensfeld-Erfurt-Leipzig/Halle-Berlin railway<br />

line), Brandkopf Tunnel - Lohmeberg Tunnel<br />

Client: DB Netz <strong>AG</strong>, Erfurt [German railway company]<br />

Contractor: <strong>Wayss</strong> & <strong>Freytag</strong> <strong>Ingenieurbau</strong> <strong>AG</strong> as commercial leader of a joint venture<br />

Construction period: August 2009 to March 2012<br />

Construction costs: € 80 million<br />

Technical Data:<br />

Scope of Work: 2 tunnels, lengths: 1,493 m and 688 m, excavated area: 120 m² - 150 m²;<br />

2 reinforced concrete railway bridges, spanning: 150 m and 87 m respectively<br />

Construction method: Drill and blast method and tunnel excavator, water proofing and inner lining<br />

Geology: Lower Rotliegend, volcanic rock, clay, siltstone and sandstone<br />