Cologne North-South Light Railway, Southern Section<br />
Germany<br />
General Data:<br />
Project: Cologne North-South Light Railway, Southern Section,<br />
single-track metro tunnel<br />
Client: Kölner Verkehrsbetriebe <strong>AG</strong>, Cologne<br />
Contractor: <strong>Wayss</strong> & <strong>Freytag</strong> <strong>Ingenieurbau</strong> <strong>AG</strong> in a joint venture<br />
Construction period: November 2003 to mid-2012<br />
Construction costs: € 470 million<br />
Technical Data:<br />
Scope of work: 3,260 m of light railway line with 2 single-track tunnels, total length: 5,400 m,<br />
internal diameter: 7.30 m; 7 stations; 1 crossover; 1 weaving section<br />
Construction method: TBM tunnelling using 2 Mixshields (slurry shields), shield diameter: 8.39 m,<br />
segmental lining; use of complex special construction methods, e.g. ground<br />
freezing, soil stabilisation (jet grouting and compaction grouting), groundwater<br />
lowering, compressed air tunnelling using ground freezing methods and pipe<br />
umbrella support systems<br />
Geology: Quaternary sands/gravels Brandkopf/Lohmeberg <strong>Tunnels</strong><br />
Germany<br />
General Data:<br />
Project: German Unity Transport Project VDE 8, Upgraded and New Railway Lines between<br />
Nuremberg and Berlin (Nuremberg-Ebensfeld-Erfurt-Leipzig/Halle-Berlin railway<br />
line), Brandkopf Tunnel - Lohmeberg Tunnel<br />
Client: DB Netz <strong>AG</strong>, Erfurt [German railway company]<br />
Contractor: <strong>Wayss</strong> & <strong>Freytag</strong> <strong>Ingenieurbau</strong> <strong>AG</strong> as commercial leader of a joint venture<br />
Construction period: August 2009 to March 2012<br />
Construction costs: € 80 million<br />
Technical Data:<br />
Scope of Work: 2 tunnels, lengths: 1,493 m and 688 m, excavated area: 120 m² - 150 m²;<br />
2 reinforced concrete railway bridges, spanning: 150 m and 87 m respectively<br />
Construction method: Drill and blast method and tunnel excavator, water proofing and inner lining<br />
Geology: Lower Rotliegend, volcanic rock, clay, siltstone and sandstone<br />