BUREAU OF LOCAL ROADS & STREETS<br />

5-5(16) <strong>AGREEMENTS</strong> Nov 2012<br />

5-5.09(b) Efficiency Factor.<br />

The consultant may also opt to include an efficiency factor. When provided in an agreement,<br />

the consultant has the opportunity to share in any direct labor cost savings achieved by the<br />

efficiencies <strong>of</strong> the consultant from the original direct labor estimate. Upon submission and<br />

approval <strong>of</strong> the final bill, when the negotiated direct labor cost upper limit is not reached, the<br />

consultant will be entitled to 1% <strong>of</strong> the remaining funds.<br />

An efficiency factor may also be applied to those contracts using the cost plus fixed fee method.<br />

When the contract’s direct labor cost upper limit is not reached, the consultant will receive 1% <strong>of</strong><br />

the difference between negotiated and actual direct labor plus overhead.<br />

5-5.09(c) Complexity Factor.<br />

Figure 5-5D presents a description for the various levels on the complexity <strong>of</strong> work.<br />

R Value Complexity <strong>of</strong> Work<br />

CPFF = 0.0<br />

DLM = 0.0<br />

CPFF = 0.035<br />

DLM = 0.003<br />

CPFF = 0.070<br />

DLM = 0.008<br />

5-5.10 Agreement Processing<br />

Low complexity projects that involve such work as project surveys,<br />

routine drafting functions, minor simple span bridges, small rural<br />

projects, project reports, and simple environmental assessments.<br />

Complex jobs that involve such work as small urban projects,<br />

freeway interchanges, projects on new alignment, freeways, multispan<br />

continuous bridges, complex environmental assessments,<br />

and design reports.<br />

Very complex work that involves such work as multi-level<br />

interchanges, movable bridges, complex major bridges, major<br />

urban freeways, complex design reports, environmental impact<br />

statements, and major engineering studies requiring special<br />

expertise.<br />

COMPLEXITY FACTOR<br />

Figure 5-5D<br />

Once the LPA and the pr<strong>of</strong>essional design firm or sole proprietorship have agreed on scope,<br />

terms, and compensation, the engineering agreement shall be submitted to the District BLRS for<br />

review.<br />

1. MFT, State, and TBP Funded Engineering Services Agreements. The District BLRS will<br />

provide approval to the LPA.