draft beb rfp - TACOM Procurement Network - U.S. Army
draft beb rfp - TACOM Procurement Network - U.S. Army
draft beb rfp - TACOM Procurement Network - U.S. Army
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
CONTINUATION SHEET<br />
Name of Offeror or Contractor:<br />
Reference No. of Document Being Continued Page 111 of 170<br />
PIIN/SIIN W56HZV-12-R-0445<br />
MOD/AMD<br />
E.6.1.1 The quality assurance plan shall include periodic QA reviews by persons different than those preparing the TMs, maintenance of<br />
QA records, TM development process improvement, and data controls to insure that current, accurate engineering data and parts<br />
information is available to TM preparers.<br />
E.6.1.1.2 The publications QA operation shall include QA personnel that are not the writers or editors of the publications being<br />
prepared. Validation records showing those publications corrections, deletions, and additions that were identified during publications<br />
validation process shall be maintained. Other QA records shall be identification of changes, corrections, deletions and additions to<br />
publications that result from QA edit reviews.<br />
E.6.1.1.3 Government representatives have the right to review and comment on the contractors QA plan, records, and processes.<br />
*** END OF NARRATIVE E0001 ***<br />
DRAFT