draft beb rfp - TACOM Procurement Network - U.S. Army
draft beb rfp - TACOM Procurement Network - U.S. Army
draft beb rfp - TACOM Procurement Network - U.S. Army
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
CONTINUATION SHEET<br />
Name of Offeror or Contractor:<br />
Reference No. of Document Being Continued<br />
PIIN/SIIN W56HZV-12-R-0445<br />
MOD/AMD<br />
Page 41 of 170<br />
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT<br />
Description/Specs./Work _________________________________<br />
Statement<br />
PROCUREMENT DOCUMENTATION TITLE:<br />
SECTION C.16.4<br />
Reference section C.16.4 and CDRL A064 for details.<br />
(End of narrative C001)<br />
Inspection _________________________<br />
and Acceptance<br />
INSPECTION: Destination ACCEPTANCE: Destination<br />
Deliveries _________________________<br />
or Performance<br />
DLVR SCH PERF COMPL<br />
________ REL CD ______________ QUANTITY __________ DATE<br />
001 1 SEE DD FORM 1423<br />
A065 FAILURE _________________________________________ ANALYSIS CORRECTIVE ACTION REPORT 1 LO $ ______________ ** NSP ** $ __________________<br />
** NSP **<br />
Description/Specs./Work _________________________________<br />
Statement<br />
PROCUREMENT DOCUMENTATION TITLE:<br />
SECTION C.18.4.2<br />
Reference section C.18.4.2 and CDRL A065 for details.<br />
(End of narrative C001)<br />
Inspection _________________________<br />
and Acceptance<br />
INSPECTION: Destination ACCEPTANCE: Destination<br />
Deliveries _________________________<br />
or Performance<br />
DLVR SCH PERF COMPL<br />
________ REL CD ______________ QUANTITY __________ DATE<br />
001 1 SEE DD FORM 1423<br />
A066 FINAL _______________________ INSPECTION REPORT 1 LO $ ______________ ** NSP ** $ __________________<br />
** NSP **<br />
Description/Specs./Work _________________________________<br />
Statement<br />
PROCUREMENT DOCUMENTATION TITLE:<br />
SECTION C.20.2<br />
DRAFT<br />
Reference section C.20.2 and CDRL A066 for details.<br />
(End of narrative C001)