09.01.2013 Views

draft beb rfp - TACOM Procurement Network - U.S. Army

draft beb rfp - TACOM Procurement Network - U.S. Army

draft beb rfp - TACOM Procurement Network - U.S. Army

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

CONTINUATION SHEET<br />

Name of Offeror or Contractor:<br />

Reference No. of Document Being Continued Page 165 of 170<br />

PIIN/SIIN W56HZV-12-R-0445<br />

MOD/AMD<br />

(d) Failure to submit and, if applicable, negotiate an acceptable subcontracting plan which, in the judgment of the Contracting Officer,<br />

provides the maximum practicable opportunity for small business and small disadvantaged business concerns to participate in the awarded<br />

contract shall render the offeror ineligible for award. In this connection, offerors should be aware of the statutory goal that has been<br />

placed on the Department of Defense to award five percent of its total planned subcontracting dollars to small disadvantaged businesses<br />

at the prime contract and subcontract levels. In view of this Congressional mandate, large businesses shall provide specific explanation<br />

as a part of any written subcontracting plan furnished in response to this solicitation/contract that identifies a goal for<br />

subcontracting to small disadvantaged business concerns that, in the aggregate, amounts to less than five percent of the bid or<br />

proposal's total subcontracting dollars.<br />

(End of Provision)<br />

(End of Clause)<br />

L-28 52.227-7001 NON-DISCLOSURE STATEMENTS NOV/2009<br />

<strong>TACOM</strong> (RI)<br />

Approval of a Non-Disclosure Agreement (NDA) is REQUIRED before the technical data package (TDP) for this solicitation can be viewed.<br />

It can take up to 24 hours after approval before you will be able to access the TDP on the WEB site.<br />

The appropriate NDA can be found at https://aais.ria.army.mil/aais/Padds_web/index.html. Click on the attachment, complete it, have it<br />

signed by an officer of your company and submit it via email to the buyer shown on page one of the solicitation. Contact the buyer if<br />

you have any questions or problems.<br />

(LS7027) (End of clause)<br />

L-29 52.233-4001 HQ-AMC LEVEL PROTEST PROCEDURES OCT/2006<br />

(a) Policy: ______<br />

A protest to a U.S. <strong>Army</strong> Materiel Command forum is a protest _____________________<br />

to the agency, within the meaning of FAR 33.103. The HQAMC-Level Protest<br />

Program is intended to encourage an interested party to seek resolution of its concerns within AMC, rather than filing a protest with<br />

the General Accounting Office (GAO), or other external forum.<br />

(b) Agency ______________ Protest:<br />

An AMC Protest may be filed with either, but not both:<br />

1. the contracting officer designated in the solicitation for resolution of protests, or,<br />

2. HQAMC at the address designated below.<br />

(c) Election _________________ of Forum:<br />

After an interested party protests an AMC procurement to HQAMC and while that protest is pending, the protestor agrees not to file a<br />

protest with the GAO, or other external forum. If the protestor has filed a protest with the GAO, or other external forum, HQAMC-level<br />

protest procedures may not be used and any protest that has been filed will be dismissed.<br />

(d) Protest __________________________<br />

Decision Authority:<br />

The AMC command counsel is designated as the HQAMC protest decision authority. In the absence of the command counsel, the deputy command<br />

counsel is designated as the HQAMC protest decision authority.<br />

(e) Time _________________________<br />

for Filing a Protest:<br />

A HQAMC protest shall be filed in accordance with the timeframes set out in FAR 33.103(e). HQAMC Office Hours are 8:00 AM to 4:30 PM<br />

Eastern Standard Time. Time for filing any document expires at 4:30 PM, Eastern Standard Time on the last day on which such filing may<br />

be made.<br />

(f) Form _______________<br />

of Protest:<br />

DRAFT<br />

HQAMC protest shall include the protestor's name, address and telephone number, including fax number; the solicitation or contract<br />

number, identity of the contracting activity and the contracting officer's name; a detailed statement of all legal and factual grounds<br />

for protest, including copies of all relevant documents; a request for a ruling; and, a request for relief. All protests

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!