draft beb rfp - TACOM Procurement Network - U.S. Army
draft beb rfp - TACOM Procurement Network - U.S. Army
draft beb rfp - TACOM Procurement Network - U.S. Army
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
CONTINUATION SHEET<br />
Name of Offeror or Contractor:<br />
Reference No. of Document Being Continued<br />
PIIN/SIIN W56HZV-12-R-0445<br />
MOD/AMD<br />
Page 23 of 170<br />
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT<br />
Deliveries _________________________<br />
or Performance<br />
DLVR SCH PERF COMPL<br />
________ REL CD ______________ QUANTITY __________ DATE<br />
001 1 SEE DD FORM 1423<br />
A024 CONTRACTOR _____________________ FORMAT TDP 1 LO $ ______________ ** NSP ** $ __________________<br />
** NSP **<br />
The cost associated with this CDRL should be priced<br />
in SLIN 0006AA.<br />
(End of narrative B001)<br />
Description/Specs./Work _________________________________<br />
Statement<br />
PROCUREMENT DOCUMENTATION TITLE:<br />
SECTION C.6.8.1.1<br />
Reference section C.6.8.1.1, Attachment 0009 and CDRL<br />
A024 for details.<br />
(End of narrative C001)<br />
Inspection _________________________<br />
and Acceptance<br />
INSPECTION: Destination ACCEPTANCE: Destination<br />
Deliveries _________________________<br />
or Performance<br />
DLVR SCH PERF COMPL<br />
________ REL CD ______________ QUANTITY __________ DATE<br />
001 1 SEE DD FORM 1423<br />
A025 GOVERNMENT _____________________ FORMAT TDP 1 LO $ ______________ ** NSP ** $ __________________<br />
** NSP **<br />
The cost associated with this CDRL should be priced<br />
in SLIN 1007AA.<br />
(End of narrative B001)<br />
Description/Specs./Work _________________________________<br />
Statement<br />
PROCUREMENT DOCUMENTATION TITLE:<br />
SECTION C.6.8.1.2<br />
DRAFT<br />
Reference section C.6.8.1.2, Attachment 0010 and CDRL<br />
A025 for details.<br />
(End of narrative C001)