CONTINUATION SHEET<br />

Name of Offeror or Contractor:<br />

Reference No. of Document Being Continued Page 145 of 170<br />

PIIN/SIIN W56HZV-12-R-0445<br />

MOD/AMD<br />

written notice the PCO shall provide timely written advice to the Contractor of the Government's decision and, if applicable, the<br />

effective data of such change(s). If the PCO's election constitutes a change which causes an increase or decrease in the cost of, or<br />

time required to perform this contract, Contractor compliance therewith shall be subject to equitable adjustment.<br />