09.01.2013 Views

draft beb rfp - TACOM Procurement Network - U.S. Army

draft beb rfp - TACOM Procurement Network - U.S. Army

draft beb rfp - TACOM Procurement Network - U.S. Army

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

CONTINUATION SHEET<br />

Name of Offeror or Contractor:<br />

Reference No. of Document Being Continued Page 118 of 170<br />

PIIN/SIIN W56HZV-12-R-0445<br />

MOD/AMD<br />

(1) GOVERNMENT REQUIRED DELIVERY SCHEDULE WITH FIRST ARTICLE TEST (FAT)<br />

ITEM NO. QTY WITHIN DAYS AFTER DATE OF CONTRACT AWARD<br />

0001AA (BEB) 4 240<br />

0001AA (BEB) 4 270<br />

0001AA (BEB) 2 300<br />

0001AA (BEB) 1 360<br />

0002AA (CPK Structure) 1 300<br />

0003AA (PQT Spt&TSP) 1 255 (starts)<br />

0004AA (Log Demo Spt) 1 450 (starts)<br />

1001AA (BEB) 75 *<br />

2001AA (BEB) 96 *<br />

3001AA (BEB) 96 *<br />

4001AA (BEB) 96 *<br />

1002AA (CPK) 96 *<br />

2002AA (CPK) 96 *<br />

3002AA (CPK) 96 *<br />

4002AA (CPK) 96 *<br />

* At a rate of seven per month beginning 180 DAC (i.e. option modification award). The rate of seven per month will not be increased,<br />

regardless of the number of options exercised, unless mutually agreed upon.<br />

1003AA LUT Spt & TSP) 1 **<br />

1004AA (LUT Trng) 1 **<br />

2003AA (OPNET) 7 **<br />

3003AA (OPNET) 7 **<br />

4003AA (OPNET) 7 **<br />

2004AA (FLMNET) 7 **<br />

3004AA (FLMNET) 7 **<br />

4004AA (FLMNET) 7 **<br />

1007AA (CSR Spt) 260 **<br />

2005AA (CSR Spt) 260 **<br />

3005AA (CSR Spt) 260 **<br />

4005AA (CSR Spt) 260 **<br />

** The Government will modify the contract at least 30 days in advance of when performance is to begin.<br />

1008AA (BEB Storage) 500 ***<br />

2006AA (BEB Storage) 500 ***<br />

3006AA (BEB Storage) 500 ***<br />

4006AA (BEB Storage) 500 ***<br />

*** Contractor storage begins 30 days after acceptance of a boat if it remains on contractor property.<br />

PCO.<br />

DRAFT<br />

(2) GOVERNMENT REQUIRED DELIVERY SCHEDULE IF THERE IS NO FIRST ARTICLE TEST (FAT), OR IF FAT IS WAIVED<br />

ITEM NO. QTY WITHIN DAYS AFTER DATE OF CONTRACT AWARD<br />

N/A N/A N/A<br />

(d) Accelerated delivery schedule is acceptable with no additional cost for storage and with written authorization from the<br />

(e) If an accelerated delivery schedule is not acceptable, the required delivery schedule above will apply. If it is<br />

acceptable, you may propose an accelerated delivery schedule at no additional cost; fill in the appropriate information here:<br />

(1) OFFERORS PROPOSED ACCELERATED DELIVERY SCHEDULE WITH FIRST ARTICLE TEST (FAT)

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!