waste organic material); building and operation of construction offices, work areas, and<br />

maintenance areas; and fill and compaction of base for facilities have been completed.<br />

The Project capital cost for the investment plan is an estimated US$4.7 billion.<br />

2.4 Project Workforce<br />

1101335.000 04F1 0611 MJ21<br />

13<br />

June 21, 2011<br />

The estimated peak construction workforce for the Project, according to CB&I, is approximately<br />

7,000 personnel, with a distribution of supervisor-senior staff, operators, and contractors. Total<br />

workers are projected to be approximately 10,780, and with turnover, could go as high as 15,000<br />

at CB&I. This does not include subcontractor workers or miscellaneous labor.<br />

The existing refinery has approximately 420 Ecopetrol staff. Additional contractual personnel<br />

provide various services, especially maintenance-related work. In addition, there are<br />

approximately 900 people currently working at the project site. The current total Project<br />

workforce is approximately 1,425, and is made up of 118 direct workers, including small teams<br />

in Bogotá and Houston, plus 1,307 indirect workers.<br />

The present estimated number of staff for the refinery operations after expansion is 500.