waste organic material); building and operation of construction offices, work areas, and<br />
maintenance areas; and fill and compaction of base for facilities have been completed.<br />
The Project capital cost for the investment plan is an estimated US$4.7 billion.<br />
2.4 Project Workforce<br />
1101335.000 04F1 0611 MJ21<br />
13<br />
June 21, 2011<br />
The estimated peak construction workforce for the Project, according to CB&I, is approximately<br />
7,000 personnel, with a distribution of supervisor-senior staff, operators, and contractors. Total<br />
workers are projected to be approximately 10,780, and with turnover, could go as high as 15,000<br />
at CB&I. This does not include subcontractor workers or miscellaneous labor.<br />
The existing refinery has approximately 420 Ecopetrol staff. Additional contractual personnel<br />
provide various services, especially maintenance-related work. In addition, there are<br />
approximately 900 people currently working at the project site. The current total Project<br />
workforce is approximately 1,425, and is made up of 118 direct workers, including small teams<br />
in Bogotá and Houston, plus 1,307 indirect workers.<br />
The present estimated number of staff for the refinery operations after expansion is 500.