- Page 1 and 2: Environmental and Social Due Dilige
- Page 3 and 4: Contents 1101335.000 04F1 0611 MJ21
- Page 5 and 6: 1101335.000 04F1 0611 MJ21 iv June
- Page 7 and 8: List of Figures Figure 1. Cartagena
- Page 9 and 10: � Task 1—Presentation to the Se
- Page 11 and 12: 2 Project Description The Cartagena
- Page 13 and 14: Reficar is requesting financing for
- Page 15 and 16: � Five steam boilers for ovens
- Page 17 and 18: industrial areas is discharged to t
- Page 19 and 20: � Nestor Pineda Terminal. The exi
- Page 21 and 22: 3 Institutional and Legal Framework
- Page 23 and 24: � Health and Safety: Resolution 2
- Page 25 and 26: � IFC Environmental, Health and S
- Page 27 and 28: 1101335.000 04F1 0611 MJ21 20 June
- Page 29 and 30: 4 Environmental and Social Conditio
- Page 31 and 32: 1101335.000 04F1 0611 MJ21 24 June
- Page 33 and 34: 1101335.000 04F1 0611 MJ21 26 June
- Page 35 and 36: 1101335.000 04F1 0611 MJ21 28 June
- Page 37: 1101335.000 04F1 0611 MJ21 30 June
- Page 41 and 42: 1101335.000 04F1 0611 MJ21 34 June
- Page 43 and 44: 5 Environmental and Social Impacts
- Page 45 and 46: of increased traffic resulting from
- Page 47 and 48: 1101335.000 04F1 0611 MJ21 40 June
- Page 49 and 50: � Selection of the appropriate mo
- Page 51 and 52: 1101335.000 04F1 0611 MJ21 44 June
- Page 53 and 54: 5.2.4 Risks As part of the EIA, a r
- Page 55 and 56: 1101335.000 04F1 0611 MJ21 around t
- Page 57 and 58: � No remains of contaminated-wast
- Page 59 and 60: 1101335.000 04F1 0611 MJ21 52 June
- Page 61 and 62: 1101335.000 04F1 0611 MJ21 54 June
- Page 63 and 64: � Monitoring and recording of inc
- Page 65 and 66: 1101335.000 04F1 0611 MJ21 acid gas
- Page 67 and 68: 1101335.000 04F1 0611 MJ21 manufact
- Page 69 and 70: 1101335.000 04F1 0611 MJ21 62 June
- Page 71 and 72: management/control, waste managemen
- Page 73 and 74: 1101335.000 04F1 0611 MJ21 66 June
- Page 75 and 76: 1101335.000 04F1 0611 MJ21 68 June
- Page 77 and 78: 1101335.000 04F1 0611 MJ21 70 June
- Page 79 and 80: 1101335.000 04F1 0611 MJ21 Projecti
- Page 81 and 82: 1101335.000 04F1 0611 MJ21 74 June
- Page 83 and 84: 8.1.3 Environmental Liabilities 110
- Page 85 and 86: 1101335.000 04F1 0611 MJ21 protests
- Page 87 and 88: 1101335.000 04F1 0611 MJ21 Reficar
- Page 89 and 90:
1101335.000 04F1 0611 MJ21 be organ
- Page 91 and 92:
1101335.000 04F1 0611 MJ21 treatmen
- Page 93 and 94:
1101335.000 04F1 0611 MJ21 new WWTP
- Page 95 and 96:
1101335.000 04F1 0611 MJ21 Colombia
- Page 97 and 98:
1101335.000 04F1 0611 MJ21 not buil
- Page 99 and 100:
1101335.000 04F1 0611 MJ21 financin
- Page 101 and 102:
1101335.000 04F1 0611 MJ21 hazardou
- Page 103 and 104:
� A grievance mechanism was estab
- Page 105 and 106:
1101335.000 04F1 0611 MJ21 7,000 fo
- Page 107 and 108:
8.4.3.1 IFC EHS General Guidelines
- Page 109 and 110:
Compensation Plan for Mangrove Remo
- Page 111 and 112:
Tables
- Page 113 and 114:
Table 1a. (cont.) � Form of indef
- Page 115 and 116:
Table 2. Project-related air emissi
- Page 117 and 118:
1101335.000 04F1 0611 MJ21 Table 4.
- Page 119 and 120:
1101335.000 04F1 0611 MJ21 Table 6.
- Page 121 and 122:
Table 7. (cont.) Recommendations Ba
- Page 123 and 124:
Table 9. Estimated waste generation
- Page 125 and 126:
Table 11. 2009 Recommendations rela
- Page 127 and 128:
Table 11. (cont.) Ficha CO R1-14 (p
- Page 129 and 130:
Table 11. (cont.) 2009 Recommendati
- Page 131 and 132:
Table 11. (cont.) Ficha DR4 (new) P
- Page 133 and 134:
Table 11. (cont.) Ficha MS R1-10 (p
- Page 135 and 136:
Table 12. (cont.) Item Action to be
- Page 137 and 138:
Table 14. Project-related total pow
- Page 139 and 140:
Table 15. (cont.) � Wastewater Tr
- Page 141 and 142:
Table 17. Conformance overview: EHS
- Page 143 and 144:
Table 18. Conformance overview: EHS
- Page 145 and 146:
Table 18. (cont.) Theme Issue Situa
- Page 147 and 148:
Figure 1. Cartagena Refinery locati
- Page 149 and 150:
Figure 3. Current configuration of
- Page 151 and 152:
Figure 5. Proposed wastewater treat
- Page 153 and 154:
1101335.000 04F1 0611 MJ21
- Page 155 and 156:
Appendix A Photograph Log
- Page 157 and 158:
Photograph Log Site Visit February
- Page 159 and 160:
Photograph Log Site Visit February
- Page 161 and 162:
Photograph Log Site Visit February
- Page 163 and 164:
Photograph Log Site Visit February
- Page 165 and 166:
Photograph Log Site Visit February
- Page 167 and 168:
Photograph Log Site Visit February
- Page 169 and 170:
Photograph Log Site Visit February
- Page 171 and 172:
Photograph Log Site Visit February
- Page 173 and 174:
Photograph Log Site Visit February
- Page 175 and 176:
Photograph Log Site Visit February
- Page 177 and 178:
Photograph Log Site Visit February
- Page 179 and 180:
Photograph Log Site Visit February
- Page 181 and 182:
Photograph Log Site Visit February
- Page 183 and 184:
Photograph Log Site Visit February
- Page 185:
Photograph Log Site Visit February