Ecopetrol started the environmental licensing process for the PMD in 1995. In 1996, the<br />

1101335.000 04F1 0611 MJ21<br />

19<br />

June 21, 2011<br />

Ministry of Environment issued the terms of reference for the environmental impact assessment<br />

(EIA) and stated that no alternative analysis was required, because the proposed project<br />

consisted only of an expansion of capacity of an existing operation. Ecopetrol submitted an EIA<br />

and environmental management plan in March 1998. MAVDT granted an environmental<br />

license to Ecopetrol for the construction and operation project of the proposed new plants for the<br />

refinery in November 2000 (Resolution 1157). The resolution identified 27 requirements.<br />

However, the present proposed Project expansion is not the same as presented, and thus, this<br />

resolution is not fully valid for the proposed refinery expansion.<br />

In January 2007, Ecopetrol and <strong>Reficar</strong> requested MAVDT to grant partial concession to<br />

<strong>Reficar</strong> of the environmental license (Resolution 1157 of 2000) granted to Ecopetrol, and<br />

MAVDT granted the partial concession (Resolution 349 of February 2007). CARIDQUE issued<br />

a similar transfer to <strong>Reficar</strong> of the responsibilities and obligations in Resolutions 433 (2002) and<br />

911 (2005).<br />

In August 2008, <strong>Reficar</strong> requested a modification to the originally proposed refinery expansion<br />

as authorized by Resolution 1157 of 2000. This modification included submittal of the Project<br />

EIA. The principal requested modifications were: one additional primary distillation unit, one<br />

additional vacuum distillation unit, one new FCCU, one new coke unit, one new alkalation unit,<br />

one additional sulfur cathodic oxidation unit, one new gas saturation unit, increase tank storage<br />

of product by 2,000,000 barrels, additional solid storage for coke and sulfur, and four new<br />

turbo-generators of 52 MW. MAVDT issued the modification authorization for the Project<br />

(presently proposed refinery expansion) in November 2008 (Resolution 2102). The<br />

authorization states that the existing authorizations/resolutions related to the existing refinery<br />

operations shall maintain in effect until initiation of the refinery expansion operations.<br />

CARDIQUE authorized the land clearing for the proposed refinery expansion in 2008<br />

(Resolutions 1045, 1063, which allowed for the clearing of 56 ha and required the planting of<br />

36,000 trees as compensation for the loss of the 5,143 trees during site clearing (1 to 7<br />

compensation ratio).