November 2010 - BC Hydro
November 2010 - BC Hydro
November 2010 - BC Hydro
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Duncan Dam Reservoir Archaeological Overview Assessment Final Report<br />
The pre-dam ortho images (with contour and TRIM overlay) were uploaded into a Trimble<br />
GeoXT GPS / with TerraSync datalogger to orient crews in pre-reservoir environments in real<br />
time. The proposed 50 m width linear transects (including outer extents and centre line) were<br />
uploaded into three separate Garmin Map60 GPS units to guide pedestrian traverses.<br />
Prior to field reconnaissance, logistical constraints required eliminating three (of the proposed<br />
thirteen) transects (4, 7 and 8) which were considered to be redundant in terms of<br />
representation.<br />
Eagle Vision Geomatics & Archaeology Ltd. 38 <strong>November</strong> 28, <strong>2010</strong>