• Assist in spill cleanup if necessary;<br />

• Collect water samples for site control testing; analysis will include but not be limited to; pH,<br />

turbidity (NTU), total suspended solids (TSS), oil and grease (mg/l).<br />

• Oversee contractor cleanup and restoration activities;<br />

• Monitor contractor work activities on a daily basis;<br />

• Contact approval agencies (i.e. DFO, MWLAP) in the event of an environmental incident or<br />

development of unforeseen site conditions with potential for serious environmental<br />

degradation;<br />

• Be on call should an emergency arise requiring the Environmental Monitor’s assistance;<br />

• Prepare correspondence as required;<br />

• Maintain detailed <strong>Project</strong> records including authorizations, EMP, EPP, permits, diaries and<br />

photographs;<br />

• Prepare weekly environmental inspection reports; and<br />

• Prepare a stand alone end-of-job environmental report within 60 days of contract completion.<br />

5.0 SCHEDULE<br />

Schedule of this project is contingent on the project approvals from regulatory agencies.<br />

Currently, the construction of the project is scheduled to start in fall 2004 and be completed in<br />

November 2006. Following is a list of anticipated dates for major project components:<br />

<strong>Project</strong> Component Anticipated Date<br />

Submit CEAA Application June 4, 2004<br />

Regulatory Approval July 30, 2004<br />

Grants Tomb Fish Salvage and Exclusion August 4, 2004<br />

Grants Tomb Fish Habitat Expansion August – September 2004<br />

Build Separation Dykes & Runoff Protection August – October 2004<br />

Site Preparatory Work December 2004<br />

Jet Grouting January 2005 – September 2005<br />

Pipeline Tunnel Work March - April 2005<br />

Pipeline and Valve House Construction April - December 2005<br />

Construct Spawning Channel October - December 2005<br />

Pipeline Tie-ins and decommissioning November – December 2005<br />

Pipeline Tunnel Work November – December 2005<br />

Embankment Construction October 2005 - October 2006<br />

Restore Fish Access to Grants Tomb January 2006<br />

Water Spawning Channels January 2006<br />

<strong>Coquitlam</strong> <strong>Dam</strong> <strong>Seismic</strong> Rehabilitation Page 25<br />

Environmental Management Plan – Version 4<br />

June 15, 2004