Coquitlam Dam Seismic Upgrade Project ... - BC Hydro
Coquitlam Dam Seismic Upgrade Project ... - BC Hydro
Coquitlam Dam Seismic Upgrade Project ... - BC Hydro
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
• Assist in spill cleanup if necessary;<br />
• Collect water samples for site control testing; analysis will include but not be limited to; pH,<br />
turbidity (NTU), total suspended solids (TSS), oil and grease (mg/l).<br />
• Oversee contractor cleanup and restoration activities;<br />
• Monitor contractor work activities on a daily basis;<br />
• Contact approval agencies (i.e. DFO, MWLAP) in the event of an environmental incident or<br />
development of unforeseen site conditions with potential for serious environmental<br />
degradation;<br />
• Be on call should an emergency arise requiring the Environmental Monitor’s assistance;<br />
• Prepare correspondence as required;<br />
• Maintain detailed <strong>Project</strong> records including authorizations, EMP, EPP, permits, diaries and<br />
photographs;<br />
• Prepare weekly environmental inspection reports; and<br />
• Prepare a stand alone end-of-job environmental report within 60 days of contract completion.<br />
5.0 SCHEDULE<br />
Schedule of this project is contingent on the project approvals from regulatory agencies.<br />
Currently, the construction of the project is scheduled to start in fall 2004 and be completed in<br />
November 2006. Following is a list of anticipated dates for major project components:<br />
<strong>Project</strong> Component Anticipated Date<br />
Submit CEAA Application June 4, 2004<br />
Regulatory Approval July 30, 2004<br />
Grants Tomb Fish Salvage and Exclusion August 4, 2004<br />
Grants Tomb Fish Habitat Expansion August – September 2004<br />
Build Separation Dykes & Runoff Protection August – October 2004<br />
Site Preparatory Work December 2004<br />
Jet Grouting January 2005 – September 2005<br />
Pipeline Tunnel Work March - April 2005<br />
Pipeline and Valve House Construction April - December 2005<br />
Construct Spawning Channel October - December 2005<br />
Pipeline Tie-ins and decommissioning November – December 2005<br />
Pipeline Tunnel Work November – December 2005<br />
Embankment Construction October 2005 - October 2006<br />
Restore Fish Access to Grants Tomb January 2006<br />
Water Spawning Channels January 2006<br />
<strong>Coquitlam</strong> <strong>Dam</strong> <strong>Seismic</strong> Rehabilitation Page 25<br />
Environmental Management Plan – Version 4<br />
June 15, 2004