water throughout this project and the protection of the water quality within the reservoir will be a<br />
critical component of this work. The environmental requirements for the protection of the<br />
drinking water supply as well as for the protection of aquatic and terrestrial life and their habitats<br />
will be the focus of this environmental management plan (EMP).<br />
Figure 3. View of <strong>Coquitlam</strong> <strong>Dam</strong> and Reservoir.<br />
1.4. PURPOSE OF THE ENVIRONMENTAL MANAGEMENT PLAN<br />
The purpose of this EMP is to; (1) identify any elements of the work that could present a risk to<br />
the receiving environment, (2) identify any potential risks to the drinking water supply while<br />
working within the watershed boundaries and (3) describe how those risks can be mitigated<br />
through proper work management including incident response procedures and protocols that will<br />
limit impacts to the environment.<br />
The EMP is a guide and resource for <strong>BC</strong> <strong>Hydro</strong> construction staff, contractors, the<br />
environmental monitor and government agencies. Environmental risks associated with this<br />
project can be managed during project planning and construction as discussed in this EMP. The<br />
EMP is included as an appendix to tender documents issued by <strong>BC</strong> <strong>Hydro</strong> and will form part of<br />
the binding contract with the Contractors. It is the Contractors’ responsibility to become familiar<br />
with the contents of the EMP and to comply with the practices and procedures identified.<br />
1.5. ENVIRONMENTAL OBJECTIVES AND GENERAL SITE CONSIDERATIONS<br />
This project will be guided by <strong>BC</strong> <strong>Hydro</strong>’s mission statement, “To provide integrated energy<br />
solutions to our customers in an environmentally and socially responsible manner”. <strong>BC</strong> <strong>Hydro</strong><br />
<strong>Coquitlam</strong> <strong>Dam</strong> <strong>Seismic</strong> Rehabilitation Page 5<br />
Environmental Management Plan – Version 4<br />