Coquitlam Dam Seismic Upgrade Project ... - BC Hydro
Coquitlam Dam Seismic Upgrade Project ... - BC Hydro
Coquitlam Dam Seismic Upgrade Project ... - BC Hydro
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
(3) he/she will use the sanitary facilities<br />
provided in the watershed. In cases<br />
where terrain does not permit the use<br />
of sanitary facilities normally<br />
provided by the District, he/she will<br />
provide alternate sanitary facilities<br />
acceptable to the District (e.g.<br />
camper’s toilet) and remove any<br />
sanitary waste for disposal outside of<br />
the watershed. In these cases, the use<br />
of alternate sanitary facilities must be<br />
approved by the District prior to<br />
entry.<br />
(4) He/she is aware of the Watershed<br />
Regulations and agrees to adhere to<br />
them, and to follow the instruction of<br />
authorized District personnel when<br />
required.<br />
1.4 A person experiencing illness of which<br />
diarrhea is a symptom or part will be<br />
required to undergo testing by the Medical<br />
Health Officer or to obtain a certificate<br />
from his/her physician stating that he/she<br />
is free from communicable disease prior to<br />
receiving clearance to enter the watershed.<br />
C:\Documents and Settings\AB Sound.CPQ15991622710\My Documents\SCFP\WatershedRegsFinal.doc