16.01.2013 Views

Stave River Water Use Plan - BC Hydro

Stave River Water Use Plan - BC Hydro

Stave River Water Use Plan - BC Hydro

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>Stave</strong> <strong>River</strong> <strong>Water</strong> <strong>Use</strong> <strong>Plan</strong><br />

Monitoring Terms of Reference June 13, 2005<br />

To analyse total phosphorous (TP) content, the TP sample test tubes and caps<br />

(one per site) will first be rinsed with the sampled water, and then filled, capped and<br />

labelled. At no time will the mouth of the bottle or the inside of the cap be touched, as it<br />

can easily become contaminated. Once filled, the sample test tubes should be placed in<br />

a cooler and then refrigerated until analysed. Once per field trip, two sample bottles of<br />

double distilled water (DDW) will be prepared as blanks for comparison purposes.<br />

Figure 2: Map of <strong>Stave</strong> Lake and Hayward Lake reservoirs showing monitor sampling<br />

locations<br />

<strong>BC</strong> <strong>Hydro</strong> Page 14

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!