Stave River Water Use Plan - BC Hydro
Stave River Water Use Plan - BC Hydro
Stave River Water Use Plan - BC Hydro
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
<strong>Stave</strong> <strong>River</strong> <strong>Water</strong> <strong>Use</strong> <strong>Plan</strong><br />
Monitoring Terms of Reference June 13, 2005<br />
To analyse total phosphorous (TP) content, the TP sample test tubes and caps<br />
(one per site) will first be rinsed with the sampled water, and then filled, capped and<br />
labelled. At no time will the mouth of the bottle or the inside of the cap be touched, as it<br />
can easily become contaminated. Once filled, the sample test tubes should be placed in<br />
a cooler and then refrigerated until analysed. Once per field trip, two sample bottles of<br />
double distilled water (DDW) will be prepared as blanks for comparison purposes.<br />
Figure 2: Map of <strong>Stave</strong> Lake and Hayward Lake reservoirs showing monitor sampling<br />
locations<br />
<strong>BC</strong> <strong>Hydro</strong> Page 14