16.01.2013 Views

Stave River Water Use Plan - BC Hydro

Stave River Water Use Plan - BC Hydro

Stave River Water Use Plan - BC Hydro

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>Stave</strong> <strong>River</strong> <strong>Water</strong> <strong>Use</strong> <strong>Plan</strong><br />

Monitoring Terms of Reference June 13, 2005<br />

e) Conduct a formal review of the monitoring program after 5 years, which will seek<br />

and incorporate feedback from local management/stakeholder groups.<br />

The primary responsibility of the <strong>Stave</strong> Management Committee will be to make<br />

ongoing management decisions that pertain to the monitor, particularly in those monitors<br />

that require a decision whether to continue after a specified time. The committee will<br />

also be responsible for final review and general distribution of all reports that relate to<br />

each monitor, including the preparation of annual summary reports of all monitors.<br />

Program Cost<br />

The overall program cost for the ten-year monitoring program is estimated to be<br />

$1,703,000. This total is $137,000 less than the amount reported in the CC report<br />

(Failing 1999) and represents a 7% reduction over initial estimates when adjusted for<br />

2004 dollars. Another difference with the CC report proposal is the annual distribution of<br />

monitor dollars. Rather than having all monitors start in year 1 and therefore, have a<br />

very high initial cost to the monitor, the start dates were staggered over several years to<br />

spread out sampling effort. As a result, annual costs are more evenly distributed over<br />

the course of the monitor. A summary of the monitoring cost for the entire program,<br />

including a comparison with monitor estimates presented by Failing (1998), is presented<br />

in Table 1.<br />

The monitoring plan budget estimate includes a provision for the development of<br />

a ten-year detailed project plan, which includes the process of seeking final approval of<br />

the plan with the <strong>Stave</strong> Management Committee. The cost given is the same as that<br />

reported in the CC report (Failing 1998), but adjusted to 2004 dollars ($30,000), and is<br />

only available in the first year of the program.<br />

Also included in the budget estimate are the funds necessary for project coordination<br />

and management, liaison with the <strong>Stave</strong> Management Committee, and the<br />

preparation of annual summary reports. The assigned cost is the same as that reported<br />

in the CC report (Failing 1999), but adjusted to 2004 dollars ($27,500). This project<br />

management fund will be the same for every year of the program, though in actuality it is<br />

likely to vary form year to year depending on the number of meetings with the<br />

Management Committee, the number of ongoing studies, and prevailing circumstances.<br />

<strong>BC</strong> <strong>Hydro</strong> Page 4

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!