<strong>Stave</strong> <strong>River</strong> <strong>Water</strong> <strong>Use</strong> <strong>Plan</strong><br />
Monitoring Terms of Reference June 13, 2005<br />
e) Conduct a formal review of the monitoring program after 5 years, which will seek<br />
and incorporate feedback from local management/stakeholder groups.<br />
The primary responsibility of the <strong>Stave</strong> Management Committee will be to make<br />
ongoing management decisions that pertain to the monitor, particularly in those monitors<br />
that require a decision whether to continue after a specified time. The committee will<br />
also be responsible for final review and general distribution of all reports that relate to<br />
each monitor, including the preparation of annual summary reports of all monitors.<br />
Program Cost<br />
The overall program cost for the ten-year monitoring program is estimated to be<br />
$1,703,000. This total is $137,000 less than the amount reported in the CC report<br />
(Failing 1999) and represents a 7% reduction over initial estimates when adjusted for<br />
2004 dollars. Another difference with the CC report proposal is the annual distribution of<br />
monitor dollars. Rather than having all monitors start in year 1 and therefore, have a<br />
very high initial cost to the monitor, the start dates were staggered over several years to<br />
spread out sampling effort. As a result, annual costs are more evenly distributed over<br />
the course of the monitor. A summary of the monitoring cost for the entire program,<br />
including a comparison with monitor estimates presented by Failing (1998), is presented<br />
in Table 1.<br />
The monitoring plan budget estimate includes a provision for the development of<br />
a ten-year detailed project plan, which includes the process of seeking final approval of<br />
the plan with the <strong>Stave</strong> Management Committee. The cost given is the same as that<br />
reported in the CC report (Failing 1998), but adjusted to 2004 dollars ($30,000), and is<br />
only available in the first year of the program.<br />
Also included in the budget estimate are the funds necessary for project coordination<br />
and management, liaison with the <strong>Stave</strong> Management Committee, and the<br />
preparation of annual summary reports. The assigned cost is the same as that reported<br />
in the CC report (Failing 1999), but adjusted to 2004 dollars ($27,500). This project<br />
management fund will be the same for every year of the program, though in actuality it is<br />
likely to vary form year to year depending on the number of meetings with the<br />
Management Committee, the number of ongoing studies, and prevailing circumstances.<br />
<strong>BC</strong> <strong>Hydro</strong> Page 4