Objectives and Future Projects<br />
Activity/Goal Remarks, Purpose Controlling Body Timeframe Target <strong>2000</strong> Activity/Goal Remarks, Purpose Controlling Body Timeframe Target <strong>2000</strong><br />
Extending disposal<br />
and treatment services<br />
Market launch of<br />
innovative Thermoselect<br />
technology for<br />
thermal residual<br />
waste treatment<br />
Extending district<br />
heating services<br />
Promotion of renewable<br />
energy sources/<br />
Energy-saving<br />
measures<br />
• Eco-tariff, green and<br />
solar<br />
• Promotion of heat<br />
pumps<br />
• Promotion of Solar<br />
thermal collector<br />
• Promotion of<br />
passive houses<br />
• The photovoltaic<br />
standard complete<br />
package „<strong>EnBW</strong><br />
Solar plus”<br />
• Photovoltaics<br />
13 facilities in<br />
Widderstall<br />
36<br />
Realisation of a closedloop<br />
system through<br />
innovative solutions<br />
To achieve pollutant<br />
levels markedly below<br />
the threshold values<br />
fixed by stringent legal<br />
regulations.<br />
Resource conservation<br />
by nearly 100% recycling<br />
of residual waste<br />
Reduction of pollutant<br />
levels from single heating<br />
systems<br />
Distribution network<br />
with over 160 service<br />
partners in Baden-<br />
Württemberg<br />
Monitoring long-term<br />
performance<br />
<strong>EnBW</strong> <strong>EnBW</strong> Holding<br />
KWG <strong>EnBW</strong> Kraftwerke AG<br />
ODR <strong>EnBW</strong> Ostwürttemberg Donau Ries AG<br />
REG <strong>EnBW</strong> Regional AG<br />
SVG <strong>EnBW</strong> Service GmbH<br />
TNG <strong>EnBW</strong> Transportnetze AG<br />
<strong>EnBW</strong> FE&D <strong>EnBW</strong>, Forschung und Entwicklung<br />
SVG B SVG, Baumanagement und allgemeiner Service<br />
SVG BF SVG, Fahrzeugwesen<br />
SVG EN SVG, Einkauf<br />
U-plus AG Ongoing + 10% turnover Development of new<br />
ecologically friendly<br />
energy technologies<br />
Thermoselect Südwest<br />
GmbH Thermische Abfallbehandlungsanlagen<br />
<strong>EnBW</strong> Kraftwerke AG<br />
(KWG)<br />
<strong>EnBW</strong><br />
<strong>EnBW</strong> Vertriebsgesellschaft<br />
GmbH (VTG)<br />
2001 (Commissioning<br />
of permanent<br />
Karlsruhe site for the<br />
first Thermoselect<br />
plant in Germany)<br />
Positive proof of environmental<br />
soundness<br />
in normal operating<br />
conditions. New concept<br />
for enhancing<br />
emergency operations<br />
Ongoing + 4.2% district<br />
heating turnover<br />
Ongoing + 12% more<br />
customers<br />
VTG Till late 2001<br />
(applications close in<br />
late <strong>2000</strong>)<br />
VTG Till late 2001<br />
(applications close end<br />
of <strong>2000</strong>)<br />
VTG Till late 2001<br />
(applications close end<br />
of <strong>2000</strong>)<br />
+ 455 facilities<br />
+ 579 new facilities<br />
+ 24 passive houses<br />
VTG Since mid <strong>2000</strong> + 97 kWp installed<br />
output<br />
<strong>EnBW</strong> Kraftwerke AG Since <strong>2000</strong> New objective<br />
• Thin-layer solar cells<br />
– pilot production<br />
• PEM 250 kW fuel<br />
cell systems – pilot<br />
project<br />
• Fuel cell systems –<br />
pilot project (NEGEV)<br />
• 1MW fuel cell<br />
systems – pilot<br />
project<br />
• Parabolic-trough solar<br />
power plant – experimental<br />
plant<br />
Transportation<br />
• Introduction of a<br />
EDP-assisted planning<br />
system for<br />
transport coordination<br />
and vehicle use<br />
• Study on propulsive<br />
use of biodiesel<br />
Power Plant<br />
Eco-Audits<br />
• Rheinhafen steam<br />
power plant<br />
Karlsruhe<br />
• Philippsburg<br />
nuclear plant<br />
• Heilbronn cogen<br />
plant<br />
Production of ultra-thin<br />
membrane solar cells<br />
using energy-saving<br />
production technology<br />
Comparison with<br />
BHKW in Bad<br />
Schönborn<br />
1 kW PEM cell system<br />
for household electricity<br />
SO fuel cells with<br />
auxiliary microturbine<br />
as demonstration plant<br />
Trials in Spain for a<br />
1.5 MWth plant<br />
Reduction of fuel consumption<br />
and exhaust<br />
levels<br />
Biodiesel has a favourable<br />
CO 2 showing;<br />
Audit acc. to EEC<br />
Eco-Audit Directive and<br />
ISO 14001<br />
Audit acc. to<br />
ISO 14001<br />
Audit acc. to EEC<br />
Eco-Audit Directive<br />
• Rudolf-Fettweiswerk Audit acc. to EEC<br />
Eco-Audit Directive<br />
<strong>EnBW</strong>/Würth AG Mid <strong>2000</strong> Marbach project in the<br />
pipeline<br />
<strong>EnBW</strong> FE&D <strong>2000</strong>-2004 Project in the pipeline<br />
<strong>EnBW</strong> FE&D <strong>2000</strong>-2005 Began <strong>2000</strong><br />
<strong>EnBW</strong> FE&D <strong>2000</strong>-2004 1 MW pilot project for<br />
Marbach in the pipeline<br />
<strong>EnBW</strong> FE&D Mid <strong>2000</strong> Project in the pipeline<br />
SVG BF Mid 2001 On-going implementation<br />
of “FUDAS” software<br />
(Investment of<br />
€ 102,258)<br />
SVG EN <strong>2000</strong> Project concluded;<br />
overall ecological value<br />
dubious<br />
<strong>EnBW</strong> Kraftwerke AG <strong>2000</strong> 5 July <strong>2000</strong>;<br />
(revalidation 2003)<br />
<strong>EnBW</strong> Kraftwerke AG <strong>2000</strong> Began August 1999<br />
<strong>EnBW</strong> Kraftwerke AG 2001 Began autumn <strong>2000</strong><br />
<strong>EnBW</strong> Kraftwerke AG 2002 New objective<br />
37