Objectives and Future Projects<br />

Activity/Goal Remarks, Purpose Controlling Body Timeframe Target <strong>2000</strong> Activity/Goal Remarks, Purpose Controlling Body Timeframe Target <strong>2000</strong><br />

Extending disposal<br />

and treatment services<br />

Market launch of<br />

innovative Thermoselect<br />

technology for<br />

thermal residual<br />

waste treatment<br />

Extending district<br />

heating services<br />

Promotion of renewable<br />

energy sources/<br />

Energy-saving<br />

measures<br />

• Eco-tariff, green and<br />

solar<br />

• Promotion of heat<br />

pumps<br />

• Promotion of Solar<br />

thermal collector<br />

• Promotion of<br />

passive houses<br />

• The photovoltaic<br />

standard complete<br />

package „<strong>EnBW</strong><br />

Solar plus”<br />

• Photovoltaics<br />

13 facilities in<br />

Widderstall<br />

36<br />

Realisation of a closedloop<br />

system through<br />

innovative solutions<br />

To achieve pollutant<br />

levels markedly below<br />

the threshold values<br />

fixed by stringent legal<br />

regulations.<br />

Resource conservation<br />

by nearly 100% recycling<br />

of residual waste<br />

Reduction of pollutant<br />

levels from single heating<br />

systems<br />

Distribution network<br />

with over 160 service<br />

partners in Baden-<br />

Württemberg<br />

Monitoring long-term<br />

performance<br />

<strong>EnBW</strong> <strong>EnBW</strong> Holding<br />

KWG <strong>EnBW</strong> Kraftwerke AG<br />

ODR <strong>EnBW</strong> Ostwürttemberg Donau Ries AG<br />

REG <strong>EnBW</strong> Regional AG<br />

SVG <strong>EnBW</strong> Service GmbH<br />

TNG <strong>EnBW</strong> Transportnetze AG<br />

<strong>EnBW</strong> FE&D <strong>EnBW</strong>, Forschung und Entwicklung<br />

SVG B SVG, Baumanagement und allgemeiner Service<br />

SVG BF SVG, Fahrzeugwesen<br />

SVG EN SVG, Einkauf<br />

U-plus AG Ongoing + 10% turnover Development of new<br />

ecologically friendly<br />

energy technologies<br />

Thermoselect Südwest<br />

GmbH Thermische Abfallbehandlungsanlagen<br />

<strong>EnBW</strong> Kraftwerke AG<br />

(KWG)<br />

<strong>EnBW</strong><br />

<strong>EnBW</strong> Vertriebsgesellschaft<br />

GmbH (VTG)<br />

2001 (Commissioning<br />

of permanent<br />

Karlsruhe site for the<br />

first Thermoselect<br />

plant in Germany)<br />

Positive proof of environmental<br />

soundness<br />

in normal operating<br />

conditions. New concept<br />

for enhancing<br />

emergency operations<br />

Ongoing + 4.2% district<br />

heating turnover<br />

Ongoing + 12% more<br />

customers<br />

VTG Till late 2001<br />

(applications close in<br />

late <strong>2000</strong>)<br />

VTG Till late 2001<br />

(applications close end<br />

of <strong>2000</strong>)<br />

VTG Till late 2001<br />

(applications close end<br />

of <strong>2000</strong>)<br />

+ 455 facilities<br />

+ 579 new facilities<br />

+ 24 passive houses<br />

VTG Since mid <strong>2000</strong> + 97 kWp installed<br />

output<br />

<strong>EnBW</strong> Kraftwerke AG Since <strong>2000</strong> New objective<br />

• Thin-layer solar cells<br />

– pilot production<br />

• PEM 250 kW fuel<br />

cell systems – pilot<br />

project<br />

• Fuel cell systems –<br />

pilot project (NEGEV)<br />

• 1MW fuel cell<br />

systems – pilot<br />

project<br />

• Parabolic-trough solar<br />

power plant – experimental<br />

plant<br />

Transportation<br />

• Introduction of a<br />

EDP-assisted planning<br />

system for<br />

transport coordination<br />

and vehicle use<br />

• Study on propulsive<br />

use of biodiesel<br />

Power Plant<br />

Eco-Audits<br />

• Rheinhafen steam<br />

power plant<br />

Karlsruhe<br />

• Philippsburg<br />

nuclear plant<br />

• Heilbronn cogen<br />

plant<br />

Production of ultra-thin<br />

membrane solar cells<br />

using energy-saving<br />

production technology<br />

Comparison with<br />

BHKW in Bad<br />

Schönborn<br />

1 kW PEM cell system<br />

for household electricity<br />

SO fuel cells with<br />

auxiliary microturbine<br />

as demonstration plant<br />

Trials in Spain for a<br />

1.5 MWth plant<br />

Reduction of fuel consumption<br />

and exhaust<br />

levels<br />

Biodiesel has a favourable<br />

CO 2 showing;<br />

Audit acc. to EEC<br />

Eco-Audit Directive and<br />

ISO 14001<br />

Audit acc. to<br />

ISO 14001<br />

Audit acc. to EEC<br />

Eco-Audit Directive<br />

• Rudolf-Fettweiswerk Audit acc. to EEC<br />

Eco-Audit Directive<br />

<strong>EnBW</strong>/Würth AG Mid <strong>2000</strong> Marbach project in the<br />

pipeline<br />

<strong>EnBW</strong> FE&D <strong>2000</strong>-2004 Project in the pipeline<br />

<strong>EnBW</strong> FE&D <strong>2000</strong>-2005 Began <strong>2000</strong><br />

<strong>EnBW</strong> FE&D <strong>2000</strong>-2004 1 MW pilot project for<br />

Marbach in the pipeline<br />

<strong>EnBW</strong> FE&D Mid <strong>2000</strong> Project in the pipeline<br />

SVG BF Mid 2001 On-going implementation<br />

of “FUDAS” software<br />

(Investment of<br />

€ 102,258)<br />

SVG EN <strong>2000</strong> Project concluded;<br />

overall ecological value<br />

dubious<br />

<strong>EnBW</strong> Kraftwerke AG <strong>2000</strong> 5 July <strong>2000</strong>;<br />

(revalidation 2003)<br />

<strong>EnBW</strong> Kraftwerke AG <strong>2000</strong> Began August 1999<br />

<strong>EnBW</strong> Kraftwerke AG 2001 Began autumn <strong>2000</strong><br />

<strong>EnBW</strong> Kraftwerke AG 2002 New objective<br />

37