5.5.8 <strong>Spec</strong>ial commissioning requirements<br />

5.5.8.1 SUBSYSTEM MMI’S<br />

Doc No. SALT<strong>1700AS0001</strong> Issue A<br />

<strong>TCS</strong> <strong>Spec</strong>ification<br />

The <strong>TCS</strong> shall support the running of subsystem MMI GUI’s on the SO and SA workstations.<br />

5.5.8.2 TEST POINTS<br />

Means shall be provided to measure electrical signals and interpret data transferred between<br />

subsystems and major electronic items within each subsystem.<br />

5.5.8.3 TEST DATA<br />

Each subsystem shall send to the <strong>TCS</strong> (Event Logger) the values of all internal variables that<br />

may need to be interrogated during commissioning and testing, but would not normally be<br />

needed for telescope control by the <strong>TCS</strong>. Details will be provided in the SALT Electrical Interface<br />

Control Dossier.<br />

5.5.9 Software<br />

Each subsystem shall comply to the requirements defined in SALT Software Standard referred to<br />

in Section 2.<br />

5.5.10 Computer Hardware<br />

Each subsystem shall comply to the requirements defined in SALT Computer Standard referred to<br />

in Section 2.<br />

5.5.11 Electrical Design<br />

5.5.11.1 UPS<br />

5.5.11.1.1 Installed Capacity<br />

The UPS will provide power to the <strong>TCS</strong> computers for at least 20 min during a power failure.<br />

5.5.11.1.2 UPS monitoring<br />

The <strong>TCS</strong> shall monitor the UPS in the following way:<br />

• The battery charge level and overall health, with operator warnings as appropriate.<br />

• A “normal power-fail” signal to indicate the loss of normal power so that contingency<br />

software can be activated (if applicable)<br />

• A “UPS power-fail” signal to warn the operator to shut-down critical software processes<br />

5.5.11.2 STANDBY POWER GENERATORS<br />

5.5.11.2.1 Installed Capacity<br />

The installed emergency power generation capacity will be adequate to allow normal<br />

operation of SALT during a power failure. Non-essential power users may be turned off.<br />

5.5.11.2.2 <strong>TCS</strong> operation upon power failure<br />

30