Appendix D: List of TBD’s and TBC’s<br />

Doc No. SALT<strong>1700AS0001</strong> Issue A<br />

<strong>TCS</strong> <strong>Spec</strong>ification<br />

The following issues are addressed in this document but require definition (TBD’s – To Be Determined) or<br />

confirmation (TBC’s – To Be Confirmed):<br />

TBD1. These documents have not yet been defined but will be by June 2001. <strong>Spec</strong>ific technical<br />

issues will be addressed in an ad hoc fashion as required.<br />

TBD2. The HET planning tools will be used as the basis for SALT. An investigation is in process to<br />

determine modifications that will be required. These requirements will be known by<br />

September 2001.<br />

TBD3. The mechanism for synchronisation for time-critical data will be finalised during the detailed<br />

design process and co-ordinated with the applicable subsystems and Instruments.<br />

TBD4. The requirements for the <strong>TCS</strong> Simulator will be finalised by Sept 2001.<br />

TBD5. The provisional display requirements will be defined after approval of the SALT Operational<br />

Requirements document. This is will be completed by May 2001.<br />

TBC1. The Guidance and Acquisition MMI on the So Workstation is provisionally part of the Payload<br />

Computer software. Some detailed concepts will require review prior to the finalisation of<br />

this decision.<br />