HiQ ® specialty gas program – <strong>Biotech</strong>, <strong>chemical</strong>, petro<strong>chemical</strong> & <strong>pharmaceutical</strong><br />

Central gas supply<br />

Detection and alarms<br />

• The need of detection is assessed. Regard should be taken to future<br />

requirements concerning types of gas and suitable flexibility<br />

to avoid unnecessary costs at a later stage.<br />

• The possibility of an auto-stop if a leak is indicated. This can be<br />

achieved using detection equipment.<br />

• The need of an alarm to an operating centre and/or an evacuation<br />

alarm within a certain area is defined.<br />

Linde has well-trained assembly teams with vast experience of specialty<br />

gas installations. Each team has a supervisor who is responsible<br />

for the completion of the project and at the same time functions<br />

as an on-site contact person.<br />

Pipe and components are delivered sealed and well packed to the<br />

assembly area.<br />

To maintain the purity requirements and to produce a tight gas system,<br />

automatic computer controlled pipe welding equipment is<br />

used. All welding is carried out using internal and external shieldgas<br />

purging, which results in a clean and bright joints.<br />

Pressure testing according to applicable standards is carried out<br />

and a protocol is established.<br />

A complete system is purged clean and analyzed to determine the<br />

humidity and oxygen content.<br />

To guarantee that a system is tight we carry out a helium leak detection<br />

test. A certificate of tightness is drawn up. Before a gas<br />

supply system can be regarded as completed and is handed over for<br />

start-up it is documented.<br />

A complete set of documentation comprises:<br />

– Layout documents (shows the entire supply systems design and<br />

positions in respective buildings).<br />

– System specifications including equipment lists.<br />

– Technical information covering all components.<br />

– Spare part lists.<br />

– Pressure testing protocols.<br />

– Analysis certificates where applicable.<br />

– Tightness certificates where applicable.<br />

– Operating and servicing instructions.