29.01.2013 Views

1.2. institutional framework of twinning operations in armenia - PAO

1.2. institutional framework of twinning operations in armenia - PAO

1.2. institutional framework of twinning operations in armenia - PAO

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

GUIDELINES ON TWINNING INSTRUMENT FOR PROGRAMME ADMINISTRATION AGENCY<br />

1.3. GENERAL FUNCTIONS AND RESPONSIBILITIES OF <strong>PAO</strong> IN<br />

TWINNING OPERATIONS IN ARMENIA<br />

In a centralized context the role <strong>of</strong> <strong>PAO</strong> <strong>in</strong> Tw<strong>in</strong>n<strong>in</strong>g can be described as follows:<br />

� The <strong>PAO</strong> has an essential role <strong>in</strong> the whole <strong>tw<strong>in</strong>n<strong>in</strong>g</strong> cycle <strong>of</strong> the project: for example, the<br />

draft<strong>in</strong>g <strong>of</strong> the ToR <strong>of</strong> the FWC and the quality control <strong>of</strong> <strong>tw<strong>in</strong>n<strong>in</strong>g</strong> fiches and contracts,<br />

� The <strong>PAO</strong> is the central po<strong>in</strong>t <strong>of</strong> communication between the EC and the BAs and between<br />

the MS Adm<strong>in</strong>istrations and the BA,<br />

� The <strong>PAO</strong> assists the ECD <strong>in</strong> the organization and management <strong>of</strong> selection meet<strong>in</strong>gs,<br />

� The <strong>PAO</strong> assists both BA and ECD <strong>in</strong> the evaluation <strong>of</strong> Tw<strong>in</strong>n<strong>in</strong>g requests submitted by EU<br />

Member States Public Authorities as well as <strong>in</strong> selection <strong>of</strong> Tw<strong>in</strong>n<strong>in</strong>g Partners,<br />

� The <strong>PAO</strong> checks that the f<strong>in</strong>ancial management <strong>of</strong> the Tw<strong>in</strong>n<strong>in</strong>g project is <strong>in</strong> compliance<br />

with EC rules,<br />

� The <strong>PAO</strong> receives and exam<strong>in</strong>es all <strong>tw<strong>in</strong>n<strong>in</strong>g</strong> project reports.<br />

9

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!