29.01.2013 Views

1.2. institutional framework of twinning operations in armenia - PAO

1.2. institutional framework of twinning operations in armenia - PAO

1.2. institutional framework of twinning operations in armenia - PAO

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

GUIDELINES ON TWINNING INSTRUMENT FOR PROGRAMME ADMINISTRATION AGENCY<br />

tak<strong>in</strong>g <strong>in</strong>to consideration other projects either planned or under implementation, for<br />

example projects funded by other donors.<br />

- A last criterion used to assess the quality <strong>of</strong> the Tw<strong>in</strong>n<strong>in</strong>g application gives an <strong>in</strong>dication<br />

about the degree <strong>of</strong> compliance with the reform strategy <strong>of</strong> the <strong>in</strong>stitution and/or Government.<br />

The Tw<strong>in</strong>n<strong>in</strong>g application has to be l<strong>in</strong>ked to the Implementation Plan <strong>of</strong> the Government <strong>of</strong><br />

Armenia <strong>of</strong> the ENP-Action Plan and to the reform strategy <strong>of</strong> the applicant <strong>in</strong>stitution.<br />

For the requests meet<strong>in</strong>g at least the eligibility criteria, the <strong>PAO</strong> will request the applicant <strong>in</strong>stitution<br />

representatives to participate <strong>in</strong> a meet<strong>in</strong>g at the <strong>PAO</strong>, <strong>in</strong> order to assess the degree <strong>of</strong> substantial<br />

conformity <strong>of</strong> the proposal. The application should be revised accord<strong>in</strong>g to the outcome <strong>of</strong> the<br />

discussion and resubmitted to <strong>PAO</strong>.<br />

To <strong><strong>in</strong>stitutional</strong>ize the Tw<strong>in</strong>n<strong>in</strong>g requests selection procedure <strong>PAO</strong> should use Tw<strong>in</strong>n<strong>in</strong>g Selection<br />

Criteria (see Annex 1). The <strong>PAO</strong> has to <strong>in</strong>dicate its general appraisal <strong>of</strong> the application, before<br />

decid<strong>in</strong>g to send the request to the Tw<strong>in</strong>n<strong>in</strong>g Project Implementation Board.<br />

Provided that the Tw<strong>in</strong>n<strong>in</strong>g request transmitted to the <strong>PAO</strong> is deemed satisfactory, corresponds to<br />

the quality criteria def<strong>in</strong>ed by the European Commission and to the selection criteria def<strong>in</strong>ed here<br />

above, the <strong>PAO</strong>, after the evaluation <strong>of</strong> requests, shall send a letter <strong>in</strong>form<strong>in</strong>g the applicant<br />

<strong>in</strong>stitution <strong>of</strong> the <strong>in</strong>clusion <strong>of</strong> the submitted request <strong>in</strong>to the prelim<strong>in</strong>ary list to be transmitted to the<br />

Tw<strong>in</strong>n<strong>in</strong>g Implementation Board. Accord<strong>in</strong>g to the Decision on <strong>PAO</strong> Functions, the <strong>PAO</strong> has to<br />

establish an <strong>in</strong>itial prioritized list <strong>of</strong> Tw<strong>in</strong>n<strong>in</strong>g project requests to the Tw<strong>in</strong>n<strong>in</strong>g Board.<br />

As described <strong>in</strong> the Annex 2 <strong>of</strong> the Decision on Tw<strong>in</strong>n<strong>in</strong>g Procedures, the Board, chaired by the<br />

M<strong>in</strong>ister <strong>of</strong> Economy, has the ma<strong>in</strong> goal to select and prioritize, through transparent and unbiased<br />

discussions, the Tw<strong>in</strong>n<strong>in</strong>g proposals to be implemented under the European Neighborhood and<br />

Partnership Instrument.<br />

The Board reviews and approves the prioritized list <strong>of</strong> Tw<strong>in</strong>n<strong>in</strong>g project proposals and identifies up<br />

to three priority project proposals to be sent to the ECD to Armenia for approval.<br />

Role <strong>of</strong> <strong>PAO</strong> <strong>in</strong> preparatory and implementation phases <strong>of</strong> Tw<strong>in</strong>n<strong>in</strong>g Board Session<br />

Dur<strong>in</strong>g the preparatory and implementation phases <strong>of</strong> the Tw<strong>in</strong>n<strong>in</strong>g Board <strong>PAO</strong> should act as a<br />

“mediator” between BAs, <strong>in</strong> which Tw<strong>in</strong>n<strong>in</strong>g requests will be presented at the Tw<strong>in</strong>n<strong>in</strong>g Board<br />

and Tw<strong>in</strong>n<strong>in</strong>g Board members. In practical terms it means that:<br />

� <strong>PAO</strong> provides support to BAs <strong>in</strong> preparation <strong>of</strong> presentation <strong>of</strong> relevant Tw<strong>in</strong>n<strong>in</strong>g<br />

Request. Special attention should be paid to the issues <strong>of</strong> eligibility <strong>of</strong> the submitted<br />

request, commitment <strong>of</strong> the Beneficiary to implement the relevant Tw<strong>in</strong>n<strong>in</strong>g Project, and<br />

absorption capacity. <strong>PAO</strong> should assure that objectives and mandatory results are<br />

clearly def<strong>in</strong>ed <strong>in</strong> a presentation to be done by a BA representative. This k<strong>in</strong>d <strong>of</strong> support<br />

may be provided by means <strong>of</strong> consultations with a BA representative.<br />

� Head <strong>of</strong> <strong>PAO</strong> may have a short speech present<strong>in</strong>g the key f<strong>in</strong>d<strong>in</strong>gs <strong>of</strong> evaluation <strong>of</strong> the<br />

Tw<strong>in</strong>n<strong>in</strong>g request submitted by BA before/after the presentation <strong>of</strong> the request by a BA<br />

representative.<br />

15

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!