GUIDELINES ON TWINNING INSTRUMENT FOR PROGRAMME ADMINISTRATION AGENCY<br />
� DRAFTING A TWINNING FICHE: Some <strong>in</strong>dications<br />
1. Please use the attached Template (updated version from the one provided <strong>in</strong> the Manual).<br />
2. Consult the Common Reference Manual on Tw<strong>in</strong>n<strong>in</strong>g Projects.<br />
49<br />
ANNEX 2<br />
3. Tw<strong>in</strong>n<strong>in</strong>g Number: will be provided by AIDCO A6 upon receipt <strong>of</strong> the first draft <strong>of</strong> the Tw<strong>in</strong>n<strong>in</strong>g<br />
Fiche.<br />
4. Logframe matrix: The Tw<strong>in</strong>n<strong>in</strong>g Fiche should be necessarily accompanied by a clear and well-<br />
elaborated logical frame matrix (Annex A1 <strong>of</strong> the <strong>tw<strong>in</strong>n<strong>in</strong>g</strong> contract, art.3), which is an essential<br />
part <strong>of</strong> the Fiche.<br />
The rema<strong>in</strong><strong>in</strong>g mentioned annexes are not compulsory.<br />
5. The objective <strong>of</strong> the <strong>tw<strong>in</strong>n<strong>in</strong>g</strong> should be concrete and clear. It should focus at the structural<br />
reform <strong>of</strong> a def<strong>in</strong>ed issue (and not aim, for <strong>in</strong>stance, at the general reform <strong>of</strong> an adm<strong>in</strong>istration).<br />
6. The Mandatory Results constitute a crucial element <strong>in</strong> the Tw<strong>in</strong>n<strong>in</strong>g Project. This should also<br />
be the case both <strong>in</strong> the Tw<strong>in</strong>n<strong>in</strong>g Fiche and the logframe matrix.<br />
7. Expected M<strong>in</strong>imum Results: for each activity there should always be an expected m<strong>in</strong>imum<br />
result.<br />
8. Budget: A breakdown <strong>of</strong> the budget –see table <strong>in</strong> Annex A3- should be provided to AIDCO A6<br />
and EC Delegation for <strong>in</strong>formation, although it should not be attached to the fiche. Only the<br />
total budget allocation should be mentioned <strong>in</strong> the project fiche.<br />
9. Organisation <strong>of</strong> study visits: should be already prelim<strong>in</strong>ary planned with the Beneficiary<br />
Adm<strong>in</strong>istration and <strong>in</strong>cluded <strong>in</strong> the Tw<strong>in</strong>n<strong>in</strong>g fiche. Explanations should be given regard<strong>in</strong>g to<br />
what extent these study visits contribute to the achievement <strong>of</strong> the mandatory results.<br />
10. Make a reference to the Acquis Communautaire (Art. 2 <strong>of</strong> the <strong>tw<strong>in</strong>n<strong>in</strong>g</strong> contract)<br />
11. Equipment: Identify if there is equipment to be purchased (although keep<strong>in</strong>g <strong>in</strong> m<strong>in</strong>d, and<br />
mak<strong>in</strong>g very clear to the Beneficiary Adm<strong>in</strong>istration, that this expenditure can not be covered by<br />
the Tw<strong>in</strong>n<strong>in</strong>g project, which allows for a maximum <strong>of</strong> 5,000 € for equipment).<br />
12. Implementation schedule: A realistic implementation schedule should be <strong>in</strong>cluded.<br />
* A general rer: Draft<strong>in</strong>g should be clear and well structured.