The work<strong>in</strong>g language is English.<br />
GUIDELINES ON TWINNING INSTRUMENT FOR PROGRAMME ADMINISTRATION AGENCY<br />
4. LOCATION AND DURATION<br />
4.1. Start<strong>in</strong>g period<br />
The assignment should start <strong>in</strong> [DATE]<br />
4.2. Foreseen f<strong>in</strong>ish<strong>in</strong>g period or duration<br />
The maximum overall duration <strong>of</strong> the assignment is 6 months.<br />
The draft<strong>in</strong>g <strong>of</strong> the Tw<strong>in</strong>n<strong>in</strong>g project fiche has to be performed over a maximum period <strong>of</strong> three<br />
months from the signature <strong>of</strong> the contract.<br />
With<strong>in</strong> this contractual period <strong>of</strong> time, the assignment is deemed completed after approval by the<br />
Contract<strong>in</strong>g Authority (EuropeAid A3) <strong>of</strong> the F<strong>in</strong>al Report.<br />
4.3. Plann<strong>in</strong>g<br />
Each visit <strong>of</strong> the experts to Armenia will be planned <strong>in</strong> detail <strong>in</strong> advance and agreed with the EC<br />
Delegation to Armenia and <strong>PAO</strong>/SATTO.<br />
It is advisable that the experts acqua<strong>in</strong>t themselves, prior to the mission, with the general<br />
pr<strong>in</strong>ciples and procedures conta<strong>in</strong>ed the revised Reference Tw<strong>in</strong>n<strong>in</strong>g Manual for Tw<strong>in</strong>n<strong>in</strong>g<br />
<strong>operations</strong> 2009 6 as it will be the procedural guide to be followed when draft<strong>in</strong>g the Tw<strong>in</strong>n<strong>in</strong>g<br />
Fiche.<br />
The mission will be executed as follows:<br />
1st visit to Brussels<br />
The Experts 1 and 2 will start the mission with a brief<strong>in</strong>g meet<strong>in</strong>g <strong>in</strong> Brussels where he will receive<br />
<strong>in</strong>formation on the overall context <strong>of</strong> the assignment and will be given all the documents necessary<br />
for the fulfilment <strong>of</strong> project tasks (Tw<strong>in</strong>n<strong>in</strong>g Manual, samples <strong>of</strong> Tw<strong>in</strong>n<strong>in</strong>g Fiches, example <strong>of</strong><br />
budget estimate, Thesaurus, etc…) as well as complementary technical advice.<br />
1st visit to Armenia<br />
Upon their arrival <strong>in</strong> Yerevan for the first part <strong>of</strong> their mission, the experts will participate <strong>in</strong> a<br />
brief<strong>in</strong>g meet<strong>in</strong>g with the Tw<strong>in</strong>n<strong>in</strong>g Programme Adm<strong>in</strong>istration Office (<strong>PAO</strong>)/Implementation <strong>of</strong><br />
Tw<strong>in</strong>n<strong>in</strong>g and TAIEX Operations (SATTO) support project. This will allow them to meet the<br />
stakeholders and to understand more precisely the specific context <strong>of</strong> their mission.<br />
At least 3 work<strong>in</strong>g days before the end <strong>of</strong> their first visit <strong>in</strong> Yerevan, the experts will meet the<br />
<strong>PAO</strong>/SATTO to report on the progress <strong>of</strong> their work and mention the possible difficulties<br />
encountered.<br />
Period between the 1st and the 2nd visit<br />
Under the responsibility <strong>of</strong> the Expert I, the experts shall send to the European Commission <strong>in</strong><br />
Brussels and the Programme Adm<strong>in</strong>istration Office/SATTO:<br />
• with<strong>in</strong> 3 work<strong>in</strong>g days after the end <strong>of</strong> their first visit to Armenia, a brief <strong>in</strong>ception report;<br />
6 http://europa.eu.<strong>in</strong>t/comm/enlargement/<strong>in</strong>stitution_build<strong>in</strong>g/<strong>tw<strong>in</strong>n<strong>in</strong>g</strong>_en.htm<br />
41