29.01.2013 Views

1.2. institutional framework of twinning operations in armenia - PAO

1.2. institutional framework of twinning operations in armenia - PAO

1.2. institutional framework of twinning operations in armenia - PAO

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

GUIDELINES ON TWINNING INSTRUMENT FOR PROGRAMME ADMINISTRATION AGENCY<br />

Role <strong>of</strong> <strong>PAO</strong> dur<strong>in</strong>g Requests identification phase<br />

Dur<strong>in</strong>g the Tw<strong>in</strong>n<strong>in</strong>g Requests Identification stage <strong>PAO</strong> support should concentrate on the<br />

rais<strong>in</strong>g <strong>of</strong> awareness <strong>of</strong> Beneficiary Institutions staff and especially designated Focal Po<strong>in</strong>ts on<br />

pr<strong>in</strong>ciples <strong>of</strong> identification <strong>of</strong> appropriate Tw<strong>in</strong>n<strong>in</strong>g Requests. The awareness rais<strong>in</strong>g may have<br />

the format <strong>of</strong> sem<strong>in</strong>ars/round tables as well as may be undertaken meet<strong>in</strong>gs with<br />

representatives <strong>of</strong> BAs (participation <strong>of</strong> Focal po<strong>in</strong>ts <strong>in</strong> such meet<strong>in</strong>gs is strongly desirable).<br />

Special attention should be given to the issues <strong>of</strong> the correct ENP Instrument (Tw<strong>in</strong>n<strong>in</strong>g, TAIEX,<br />

Sigma or others) depend<strong>in</strong>g on identified needs.<br />

<strong>PAO</strong> should also work with Beneficiary Institutions to help them to formulate eligible Tw<strong>in</strong>n<strong>in</strong>g<br />

Requests as well as to make classification <strong>of</strong> “Technical Assistance” requests/ <strong>of</strong> Beneficiary by<br />

types <strong>of</strong> ENP Instruments. In other words <strong>PAO</strong> should not only help to elaborate relevant<br />

Tw<strong>in</strong>n<strong>in</strong>g Requests, but also should advise how to use other ENP Instruments (TAIEX, Sigma,<br />

etc) to address the identified needs <strong>of</strong> <strong>in</strong>stitution build<strong>in</strong>g <strong>of</strong> a given Adm<strong>in</strong>istration.<br />

Before the <strong>of</strong>ficial application process beg<strong>in</strong>s, i.e. before the <strong>of</strong>ficial call for proposals sent by the<br />

<strong>PAO</strong> to the BAs over their Focal Po<strong>in</strong>t, <strong>PAO</strong> should organize regular meet<strong>in</strong>gs with the<br />

potentially <strong>in</strong>terested public <strong>in</strong>stitutions. These regular meet<strong>in</strong>gs may be scheduled accord<strong>in</strong>g to<br />

the different fields <strong>of</strong> economic, social and environmental issues.<br />

These regular meet<strong>in</strong>gs have the aim <strong>of</strong> discuss<strong>in</strong>g the <strong>in</strong>stitution and capacity build<strong>in</strong>g needs <strong>of</strong><br />

the Armenian adm<strong>in</strong>istrations, <strong>in</strong> order for the <strong>PAO</strong> to be fully aware <strong>of</strong> the state <strong>of</strong> reforms <strong>in</strong><br />

each adm<strong>in</strong>istration or public <strong>in</strong>stitution, and to identify the best ways and means to address<br />

these needs under the available EU-<strong>in</strong>struments (Tw<strong>in</strong>n<strong>in</strong>g, but also TAIEX, classical Technical<br />

Assistance, budgetary support or other donor activities). The question <strong>of</strong> coord<strong>in</strong>ation <strong>of</strong><br />

activities <strong>of</strong> different donor organizations <strong>in</strong> a given public <strong>in</strong>stitution should be tackled, with a<br />

view to avoid overlapp<strong>in</strong>g but to foster complementarities between donors.<br />

These regular meet<strong>in</strong>g sessions enable the <strong>PAO</strong> to be fully aware <strong>of</strong> the history <strong>of</strong> assistance to<br />

a given public <strong>in</strong>stitution, thus be<strong>in</strong>g <strong>in</strong> a position, together with the Focal Po<strong>in</strong>t <strong>of</strong> that <strong>in</strong>stitution,<br />

<strong>of</strong> f<strong>in</strong>d<strong>in</strong>g the best <strong>in</strong>stitution build<strong>in</strong>g tool to address the identified needs (legal expertise for<br />

approximation with EU rules and standards, structural reform plans, needed advice for<br />

implementation <strong>of</strong> already passed laws or envisaged law changes, issues <strong>of</strong> coord<strong>in</strong>ation<br />

between various m<strong>in</strong>istries and public <strong>in</strong>stitutions on a given cross-cutt<strong>in</strong>g issue, etc).<br />

As a result <strong>of</strong> these regular meet<strong>in</strong>g sessions, <strong>PAO</strong> will receive much better designed Tw<strong>in</strong>n<strong>in</strong>g<br />

requests com<strong>in</strong>g from potential beneficiary <strong>in</strong>stitutions, and this will facilitate the whole process<br />

<strong>of</strong> prioritization and programm<strong>in</strong>g <strong>of</strong> Tw<strong>in</strong>n<strong>in</strong>g projects.<br />

Adm<strong>in</strong>istrative steps followed by the <strong>PAO</strong> accord<strong>in</strong>g to the Decision on Tw<strong>in</strong>n<strong>in</strong>g<br />

Procedures:<br />

11

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!