GUIDELINES ON TWINNING INSTRUMENT FOR PROGRAMME ADMINISTRATION AGENCY<br />

The fiche will be translated <strong>in</strong>to Armenian. Translation should be made already from the first<br />

draft <strong>of</strong> the fiche. This will be adapted accord<strong>in</strong>g to the changes until the f<strong>in</strong>al version is<br />

endorsed (suitable provisions should be foreseen <strong>in</strong> the budget to that effect, under<br />

reimbursable expenses).<br />

See also po<strong>in</strong>t 2.5.<br />

b) The budget estimate: it is elaborated for the <strong>in</strong>formation <strong>of</strong> the EC and the Tw<strong>in</strong>n<strong>in</strong>g<br />

<strong>PAO</strong>/SATTO. Its scope is to check the consistency between the overall budget available and<br />

the foreseen activities to be undertaken. It is also helpful <strong>in</strong> tak<strong>in</strong>g <strong>in</strong>to account the constra<strong>in</strong>ts<br />

on eligible expenses under <strong>tw<strong>in</strong>n<strong>in</strong>g</strong> projects. This estimate is however not prescriptive and<br />

will not be communicated to other parties (i.e. the Beneficiary Adm<strong>in</strong>istration and Member<br />

States). While mak<strong>in</strong>g the budget estimate, the Contractor shall take note that the maximum<br />

budget available for the Tw<strong>in</strong>n<strong>in</strong>g project is [PROJECT BUDGET] EUR.<br />

c) Two mission reports: the experts will draft two concise and operational mission reports <strong>in</strong><br />

English: a brief <strong>in</strong>ception report just after the first mission and a f<strong>in</strong>al report (draft to be<br />

submitted after the 2 nd mission to Armenia, as referred <strong>in</strong> the section 4.3, and f<strong>in</strong>alised after<br />

the study trip).<br />

3. EXPERTS PROFILE<br />

3.1. Number <strong>of</strong> requested experts per category and number <strong>of</strong> man-days per expert<br />

2 experts are required <strong>in</strong> the <strong>framework</strong> <strong>of</strong> this mission.<br />

Expert No 1 – Team Leader, [SECTOR SPECIFIC] Expert (Category I)<br />

Man-days: 35<br />

Expert No 2 – Tw<strong>in</strong>n<strong>in</strong>g Expert (Category I)<br />

Man-days: 30<br />

Local Expert (Logistics/<strong>in</strong>terpretation/translation)/Category II<br />

Man-days: 25<br />

Note that the mission <strong>in</strong>put (experts work) is expressed <strong>in</strong> work<strong>in</strong>g days. The total assignment<br />

duration is expressed <strong>in</strong> calendar days. Days <strong>of</strong> travel are considered as work<strong>in</strong>g days. Saturday<br />

spent <strong>in</strong> Armenia may be <strong>in</strong>voiced by consultants while on mission <strong>in</strong> Yerevan and <strong>in</strong> exceptional<br />

circumstances Sunday after approval <strong>of</strong> the Task Manager.<br />

The <strong>in</strong>dicative allocation <strong>of</strong> the experts’ <strong>in</strong>put is recommended <strong>in</strong> the follow<strong>in</strong>g way. For Expert 1<br />

and Expert 2, the recommended duration <strong>of</strong> the first mission to Yerevan is 2 weeks (up to 11<br />

work<strong>in</strong>g days <strong>in</strong> Yerevan), the second mission to Yerevan – 1 week (up to 5 work<strong>in</strong>g days <strong>in</strong><br />

Yerevan).<br />

Out <strong>of</strong> the time allocation for the experts 1 and 2, up to 2 days will be dedicated to the brief<strong>in</strong>g with<br />

the European Commission services <strong>in</strong> Brussels, to take place before the first visit to Yerevan.<br />

Up to 30% <strong>of</strong> the time allocated to experts 1 and 2 can be used:<br />

a) for preparation <strong>of</strong> the missions;<br />

39