02.02.2013 Views

Internal consistency of risk free rate and MRP in the CAPM

Internal consistency of risk free rate and MRP in the CAPM

Internal consistency of risk free rate and MRP in the CAPM

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

universal service obligation reform, <strong>in</strong>clud<strong>in</strong>g: <strong>the</strong> appropriate level <strong>of</strong> obligations; <strong>the</strong> use <strong>of</strong><br />

contestable models <strong>of</strong> provision, alternative fund<strong>in</strong>g models, cost<strong>in</strong>g <strong>of</strong> <strong>the</strong> obligations.<br />

2006-07 GDSE, Macau, SAR PRC<br />

Efficient Electricity Tariff Reform<br />

Advise <strong>the</strong> Macau regulator (GDSE) on efficient tariff reform for <strong>the</strong> vertically <strong>in</strong>teg<strong>rate</strong>d<br />

generation <strong>and</strong> network provider. This <strong>in</strong>volved estimat<strong>in</strong>g <strong>the</strong> LRMC on maximum dem<strong>and</strong><br />

<strong>and</strong> translat<strong>in</strong>g this <strong>in</strong>to efficient tariff designs given relevant constra<strong>in</strong>ts (eg, meter<strong>in</strong>g<br />

constra<strong>in</strong>ts).<br />

2005-06 Integral Energy, Australia<br />

Efficient Electricity Tariff Reform<br />

Advise Integral Energy on its LRMC <strong>of</strong> meet<strong>in</strong>g grow<strong>in</strong>g network dem<strong>and</strong> <strong>and</strong> on how this<br />

could be reflected <strong>in</strong> efficient tariff design (<strong>in</strong>clud<strong>in</strong>g design <strong>of</strong> critical peak pric<strong>in</strong>g).<br />

2005 Telecom New Zeal<strong>and</strong>, New Zeal<strong>and</strong><br />

Modell<strong>in</strong>g <strong>of</strong> New Entrant Costs for TSO<br />

Provide expert reports on <strong>the</strong> correct methodology for calculat<strong>in</strong>g <strong>the</strong> cost <strong>of</strong> provid<strong>in</strong>g <strong>the</strong><br />

TSO (universal service obligation) us<strong>in</strong>g new entrant costs.<br />

2005 Telecom New Zeal<strong>and</strong>, New Zeal<strong>and</strong><br />

Operat<strong>in</strong>g Cost Benchmarks<br />

Advised Telecom on appropriate operat<strong>in</strong>g cost benchmarks for telecommunications services<br />

2005 TransGrid, Australia<br />

Capital Expenditure Indexation<br />

Advised TransGrid on <strong>the</strong> development <strong>of</strong> a price <strong>in</strong>dex to reflect movements <strong>in</strong> <strong>the</strong> unit costs<br />

<strong>of</strong> <strong>in</strong>puts <strong>in</strong>to its capital expenditure program.<br />

2005 TransGrid, Australia<br />

Forecast <strong>of</strong> Capital Expenditure<br />

Advised TransGrid on appropriate adjustments to forecast capital expenditure to take account<br />

<strong>of</strong> material <strong>in</strong>creases <strong>in</strong> dem<strong>and</strong> for <strong>in</strong>vestment <strong>in</strong> future Australian electricity <strong>in</strong>frastructure.<br />

2005 TransGrid, Australia<br />

ACCC’s Capital Expenditure Regime<br />

Advised TransGrid on <strong>the</strong> ACCC’s proposed regulatory regime to apply to capital<br />

expenditure.<br />

2005 Actew, Australia<br />

F<strong>in</strong>anc<strong>in</strong>g <strong>of</strong> New Infrastructure<br />

Advised Actew on options for f<strong>in</strong>anc<strong>in</strong>g new <strong>in</strong>frastructure.<br />

2004 Telecom New Zeal<strong>and</strong>, New Zeal<strong>and</strong><br />

Avoided Retail Cost Study<br />

Develop<strong>in</strong>g an avoided cost study associated with Telecom’s fixed l<strong>in</strong>e retail activities.<br />

2004 TransGrid, Australia<br />

Fair Shar<strong>in</strong>g <strong>of</strong> Efficiency Ga<strong>in</strong>s<br />

Provided a report to TransGrid advis<strong>in</strong>g on whe<strong>the</strong>r <strong>the</strong> ACCC’s draft decision was consistent<br />

with <strong>the</strong> National Electricity Code’s requirement that <strong>the</strong>re be a ‘fair shar<strong>in</strong>g’ <strong>of</strong> efficiency<br />

ga<strong>in</strong>s.<br />

2004 Australian Competition <strong>and</strong> Consumer Commission, Australia<br />

Asset Valuation Report<br />

Provided an expert report to <strong>the</strong> ACCC on <strong>the</strong> calculation <strong>of</strong> depreciated optimised<br />

replacement cost (DORC) <strong>in</strong> <strong>the</strong> context <strong>of</strong> <strong>the</strong> EAPL’s appeal <strong>of</strong> <strong>the</strong> ACCC’s valuation <strong>of</strong> its<br />

Moomba to Sydney pipel<strong>in</strong>e.<br />

2004 ESCOSA, Australia

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!