30.06.2013 Views

Manuel de montage

Manuel de montage

Manuel de montage

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

B9) longitudinal fuselage battens 328 (one on top, two on bottom). Install<br />

Do not torque the screws in B9A and B9C.<br />

B C A<br />

D E<br />

F<br />

D<br />

B9<br />

B9) les nervures longitudinales 328 (une au <strong>de</strong>ssus Poser<br />

Ne pas serrer les vis du <strong>de</strong>ssus en B9A et B9C. <strong>de</strong>ssous). en <strong>de</strong>ux et<br />

KAR s.a. ASSEMBLY MANUAL XAIR HANUMAN 2009, July, 21 ©Randkar 2009 Prohibited reproduction / Reproduction interdite B9D B9E B9F RAND<br />

B9C<br />

B9A<br />

Page 31 / 85<br />

B9B

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!