こちら(PDF)
こちら(PDF)
こちら(PDF)
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
B2. Existing procedures and standards for non residential buildings.<br />
Commissioning of an Ice storage system, Jean Lebrun, Liege University, Belgium.<br />
11:40 - 12:20: SubTask C: BEMS assisted commissioning tools<br />
Enquiry on Bems commissioning practices and user needs in France, H Vaezi Nejad,<br />
M Jandon, CSTB, B. Viaud, B. Clémençon, EDF / France.<br />
BEMS-assisted commissioning for acceptance in an actual project, Kasuyasu HAMADA, YAMATAKE<br />
Building Systems / Japan.<br />
12:20 - 14:00: Lunch<br />
14:00 - 14:40: Subtask D: Design models and commissioning<br />
Ideas on commissioning in building processes on the performance concept, Per Göransson, ÅF-VVS<br />
PROJEKT AB / Sweden.<br />
Research on suitability of existing tools for commissioning of low energy climatisation,<br />
Erwin MLECNIK, Energie Duurzaam vzm / Belgium.<br />
14:40 - 15:00: Other topic<br />
Requirements: control industry perspective of commissioning, Tim Salisbury, Johnson Control / USA;<br />
15:00 - 17:30: Break out sessions<br />
Commissioning process ;<br />
Manual commissioning, residential buildings (NL) ;<br />
Manual commissioning, non residential buildings ;<br />
BEMS assisted commissioning ;<br />
Design models and commissioning (S).<br />
2 ND DAY<br />
8:00 - 10:40: Report on break out sessions and discussions on WP organisation<br />
10:40 - 11:00: Coffee break<br />
11:00 - 12:00: Subtask E: Description of a national Commissioning project<br />
Canadian Commissioning Project, Daniel CHOINIERE, CANMET / Canada.<br />
Testing and Demonstrating Commissioning Tools at the Energy Resource Station.<br />
John HOUSE Iowa Energy Center / USA.<br />
The Swedish Commissioning Project, Jörgen Eriksson Swedish National Testing and Research Institute /<br />
Sweden.<br />
12:00 - 14:00: Lunch<br />
14:00 - 15:00: Work for the next 6 months<br />
15:00 - 16:00: Practical organisation<br />
Web site, documents numbering, data base of commissioning projects…, place and location of the next<br />
meeting.<br />
16:00: End of the meeting.<br />
b) タスク参加(予定):<br />
22<br />
●<br />
●は後日、国内委員会で参加決定