Developments in investments (CZK billions)<br />
1999<br />
2000<br />
2001<br />
2002<br />
2003<br />
<strong>2004</strong><br />
0 0.5 1 1.5 2 2.5<br />
Capital expenditure Investments into excavating technology<br />
Capital Investment Projects at Doly Bílina<br />
The following significant projects were completed in <strong>2004</strong>:<br />
— third stage of the construction of the third coal exhaust,<br />
— modernization of the crushing machines in the boiler coal crushing plant at the Ledvice Coal<br />
Preparation Facility,<br />
— acquisition of a new belt conveyor for the coalface side of the third coal exhaust,<br />
— reconstruction of the vehicle scales at the coal dust dump in Ledvice,<br />
— modernization of the drive unit of 1,200 mm belt conveyor No 57,<br />
— rerouting, modernization, and overhaul of the conveyor line from the Radovesice external spoil heap<br />
to the internal spoil heap,<br />
— reconstruction of the radius of the bucket-wheel boom of the KU 300/91 excavator, and<br />
— reconstruction of the driver’s cabin of the KU 800/19 excavator.<br />
Capital Investment Projects at Doly Nástup Tušimice<br />
The following significant projects were completed in <strong>2004</strong>:<br />
— modernization of the TR II transformer station,<br />
— reduction in the transport distance of the tandem conveyors at the S1 overburden,<br />
— increase in the capacity of the Černovice pumping station,<br />
— new pumping station for belt conveyor No 105, and<br />
— modernization of belt conveying at the S1 overburden.<br />
The following projects were in progress:<br />
— supply of a new SchRs 1320 excavator (due for completion in January 2006),<br />
— increase in the capacity of the Březno mine water treatment plant (due for completion in February 2005),<br />
and<br />
— fourth stage of the construction of the Quarry Operation central control centre (due for completion<br />
in March 2005).<br />
Company Administration Investment Projects<br />
The following modules have in productive operation since 1 January 2005 as part of the programme<br />
to implement the new SAP information system: financial accounting, tangible and intangible assets,<br />
treasury, controlling, sales, supply and warehouses, document management, and workflow.<br />
Principal Future Investments<br />
At Doly Bílina, the Libkovice pumping station will be relocated, the Hrdlovka pumping station will<br />
be replaced, and the capacity of Nut o2 fuel production will be increased.<br />
At Doly Nástup Tušimice, the technology of the crushing plant (ÚDUT II) and the loading bin<br />
(NZ II) will be modernized together with the TR IV transformer station.