Developments in investments (CZK billions)<br />

1999<br />

2000<br />

2001<br />

2002<br />

2003<br />

<strong>2004</strong><br />

0 0.5 1 1.5 2 2.5<br />

Capital expenditure Investments into excavating technology<br />

Capital Investment Projects at Doly Bílina<br />

The following significant projects were completed in <strong>2004</strong>:<br />

— third stage of the construction of the third coal exhaust,<br />

— modernization of the crushing machines in the boiler coal crushing plant at the Ledvice Coal<br />

Preparation Facility,<br />

— acquisition of a new belt conveyor for the coalface side of the third coal exhaust,<br />

— reconstruction of the vehicle scales at the coal dust dump in Ledvice,<br />

— modernization of the drive unit of 1,200 mm belt conveyor No 57,<br />

— rerouting, modernization, and overhaul of the conveyor line from the Radovesice external spoil heap<br />

to the internal spoil heap,<br />

— reconstruction of the radius of the bucket-wheel boom of the KU 300/91 excavator, and<br />

— reconstruction of the driver’s cabin of the KU 800/19 excavator.<br />

Capital Investment Projects at Doly Nástup Tušimice<br />

The following significant projects were completed in <strong>2004</strong>:<br />

— modernization of the TR II transformer station,<br />

— reduction in the transport distance of the tandem conveyors at the S1 overburden,<br />

— increase in the capacity of the Černovice pumping station,<br />

— new pumping station for belt conveyor No 105, and<br />

— modernization of belt conveying at the S1 overburden.<br />

The following projects were in progress:<br />

— supply of a new SchRs 1320 excavator (due for completion in January 2006),<br />

— increase in the capacity of the Březno mine water treatment plant (due for completion in February 2005),<br />

and<br />

— fourth stage of the construction of the Quarry Operation central control centre (due for completion<br />

in March 2005).<br />

Company Administration Investment Projects<br />

The following modules have in productive operation since 1 January 2005 as part of the programme<br />

to implement the new SAP information system: financial accounting, tangible and intangible assets,<br />

treasury, controlling, sales, supply and warehouses, document management, and workflow.<br />

Principal Future Investments<br />

At Doly Bílina, the Libkovice pumping station will be relocated, the Hrdlovka pumping station will<br />

be replaced, and the capacity of Nut o2 fuel production will be increased.<br />

At Doly Nástup Tušimice, the technology of the crushing plant (ÚDUT II) and the loading bin<br />

(NZ II) will be modernized together with the TR IV transformer station.