01.03.2013 Views

17107/12 FL/ne 1 DG E 2 A COU CIL OF THE EUROPEA U ... - Europa

17107/12 FL/ne 1 DG E 2 A COU CIL OF THE EUROPEA U ... - Europa

17107/12 FL/ne 1 DG E 2 A COU CIL OF THE EUROPEA U ... - Europa

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

4. In the telecommunications sector, the amount of Union financial aid shall not exceed:<br />

(a) for actions in the field of broadband <strong>ne</strong>tworks, 50 % of the eligible cost;<br />

(b) for actions in the field of ge<strong>ne</strong>ric services, 75 % of the eligible costs;<br />

(c) [...]<br />

(d) for horizontal priorities including infrastructure mapping, twinning and technical<br />

assistance, 75 % of the eligible costs.<br />

4a. In the telecommunications sector, core service platforms shall typically be funded by<br />

procurement. In exceptional cases, they may be funded by a grant covering up to 75 % of<br />

eligible costs and up to 100% for the platform providing a single access point to European<br />

cultural heritage.<br />

5. The co-financing rates mentio<strong>ne</strong>d above may be increased by up to 10 percentage points for<br />

actions having cross-sector sy<strong>ne</strong>rgies, reaching climate mitigation objectives, enhancing<br />

climate resilience or reducing the greenhouse gas emissions. [This increase should not apply<br />

to co-financing rates referred to in Article 11] 46 .<br />

6. The amount of financial aid to be granted to the actions selected will be modulated based on a<br />

cost-be<strong>ne</strong>fit analysis of each project 47 , the availability of Union budget resources, and the<br />

<strong>ne</strong>ed to maximise the leverage of Union funding.<br />

46<br />

Reservation pending the final decision on the transfer of EUR 10 billion from the Cohesion<br />

Fund.<br />

47<br />

To be elaborated in a recital that an ex ante assessment of market imperfections has to be<br />

included in the cost-be<strong>ne</strong>fit analysis of each project.<br />

<strong>17107</strong>/<strong>12</strong> <strong>FL</strong>/<strong>ne</strong> 37<br />

ANNEX <strong>DG</strong> E 2 A E

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!