Comfort 250, 252 - Marantec
Comfort 250, 252 - Marantec
Comfort 250, 252 - Marantec
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
D. Installation<br />
1<br />
Preparation<br />
• Unpack the boom and the motor unit and keep it ready for mounting.<br />
2<br />
Required tools<br />
Combination wrench SW 10<br />
Combination wrench SW 13<br />
Socket wrench SW 8<br />
Socket wrench SW 10<br />
Socket wrench SW 13<br />
Screw driver, size 5<br />
Screw driver, size 8<br />
Phillips Screw driver, size 2<br />
3<br />
English Page 8<br />
Masonry drill ø 6 mm<br />
Masonry drill ø 10 mm<br />
Metal drill ø 5 mm<br />
Pliers<br />
Hack saw<br />
Electric drill<br />
Electric drill<br />
Attention!<br />
Before drilling, cover the motor unit with foil or cardboard.<br />
Drilling dust and chippings can lead to malfunctions.<br />
Site requirements<br />
• Please suspend the motor unit together with the boom in such a way,<br />
that the upper door edge lies approx. 10 mm below the downward horizontal<br />
boom edge- measured at the highest point of the opening course<br />
(see points 8, 9 and 10).<br />
• Mount the unit to the ceiling according to the site requirements.<br />
Please observe as well the indicated measurements for wall plug drilling.