03.03.2013 Views

Comfort 250, 252 - Marantec

Comfort 250, 252 - Marantec

Comfort 250, 252 - Marantec

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

J. Initial operation and maintenance<br />

Initial operation<br />

Attention!<br />

Power operated windows, doors and gates for industrial use have<br />

to be checked before initial operation or if necessary, but at least<br />

once a year by a specialist (with written documentation)!<br />

Maintenance instructions<br />

Please observe the following points in order to guarantee a faultless function:<br />

• Check the separate counterbalance of the door regularly.<br />

The door has to be moved easily by hand if the operator is disengaged.<br />

• The door system, especially cables, springs and fixing components have to be<br />

checked regularly for signs of wear, damages or for faulty balance.<br />

• The function of automatic cut-out 'open' and 'close' has to be checked<br />

regularly.<br />

• Test monthly, if the operator reverses when the door meets an obstacle of<br />

50 mm that is lying on the floor.<br />

Correct, if necessary, the adjustment of the reversion function and test it<br />

again, because a wrong adjustment could be dangerous.<br />

Caution!<br />

The door system must not be used during repair or adjustment<br />

works. A fault in the system or a wrongly balanced door may<br />

cause injuries.<br />

English Page 81<br />

GB GB

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!