Comfort 211 accu / solar - Marantec
Comfort 211 accu / solar - Marantec
Comfort 211 accu / solar - Marantec
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
6. Installation<br />
6.5 Ceiling installation<br />
of the operator system<br />
6.5 / 1<br />
The operator system is fixed to the ceiling with one<br />
support.<br />
6.5 / 2<br />
i<br />
Reference:<br />
When using multi-component booms,<br />
refer to the enclosed instruction<br />
manual.<br />
A<br />
≤ 300 mm<br />
• Mount the support bracket (A) onto the boom at the<br />
support position.<br />
18 Manual for installation and operation, <strong>Comfort</strong> <strong>211</strong> <strong>accu</strong> / <strong>solar</strong> GB (#73385)<br />
6.5 / 3<br />
B<br />
• Push the support plate (B) into the support bracket.<br />
6.5 / 4<br />
• Bend the support plate according to site conditions.<br />
6.5 / 5<br />
8,0 x 70<br />
A8 / U10<br />
15 - 30°<br />
• Screw the support plate to the ceiling.