03.03.2013 Views

Comfort 211 accu / solar - Marantec

Comfort 211 accu / solar - Marantec

Comfort 211 accu / solar - Marantec

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

6. Installation<br />

6.5 Ceiling installation<br />

of the operator system<br />

6.5 / 1<br />

The operator system is fixed to the ceiling with one<br />

support.<br />

6.5 / 2<br />

i<br />

Reference:<br />

When using multi-component booms,<br />

refer to the enclosed instruction<br />

manual.<br />

A<br />

≤ 300 mm<br />

• Mount the support bracket (A) onto the boom at the<br />

support position.<br />

18 Manual for installation and operation, <strong>Comfort</strong> <strong>211</strong> <strong>accu</strong> / <strong>solar</strong> GB (#73385)<br />

6.5 / 3<br />

B<br />

• Push the support plate (B) into the support bracket.<br />

6.5 / 4<br />

• Bend the support plate according to site conditions.<br />

6.5 / 5<br />

8,0 x 70<br />

A8 / U10<br />

15 - 30°<br />

• Screw the support plate to the ceiling.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!