TECHNICAL SERVICE MANUAL PRIMEA LINE 2007
TECHNICAL SERVICE MANUAL PRIMEA LINE 2007
TECHNICAL SERVICE MANUAL PRIMEA LINE 2007
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
8.1 Routine maintenance checklist<br />
S= Replacement<br />
R= Service<br />
P= Cleaning<br />
D= Descaling<br />
C= Inspection<br />
*= Number of beverages dispensed<br />
Parts Task Reason Item<br />
REV. 00 - Mar. 07<br />
Maintenance<br />
5,000*<br />
10,000*<br />
Casing, tanks, containers, power<br />
cable<br />
Water coffee andmilk pipes<br />
C C C Dirty, damaged see documentation (exploded drawings)<br />
GACO DIM 14 seals S S S Wear<br />
Water filter S S S Dirty, hygiene<br />
Silicon tube C D D Dirty, scale, leaks see documentation (exploded drawings)<br />
Turbine C D D Dirty, scale, leaks see documentation (exploded drawings)<br />
Boiler C D D Dirty, scale, leaks see documentation (exploded drawings)<br />
Multi-valve C D D Dirty, scale, leaks see documentation (exploded drawings)<br />
Boiler valve o-ring S S S Dirty, scale, leaks<br />
Dispensing head P P P Dirty, hygiene see documentation (exploded drawings)<br />
Cappuccino valve P P P Dirty, hygiene see documentation (exploded drawings)<br />
Grinder<br />
Burrs<br />
Check strength of ground coffee<br />
Brew unit<br />
P<br />
C<br />
P<br />
C<br />
P<br />
C<br />
Dirty, hygiene<br />
Grain size and dose<br />
see documentation (exploded drawings)<br />
Cleaning C R R Dirty, hygiene<br />
Lubrication C R R Dirty, hygiene<br />
O-ring C S S Wear see documentation (exploded drawings)<br />
Full service<br />
Other tasks<br />
C C C Wear<br />
Descale C D D<br />
Then check<br />
condition of parts<br />
Temperature check C C C Client information<br />
Explanation of fault C C C Client information<br />
Safety check C C C Always<br />
Packing C C S Check, always Use new packaging if necessary<br />
<strong>PRIMEA</strong> <strong>2007</strong> Chapter 08<br />
1/1