22.03.2013 Views

Lunar Reconnaissance Orbiter Mission Operations Review (MOR ...

Lunar Reconnaissance Orbiter Mission Operations Review (MOR ...

Lunar Reconnaissance Orbiter Mission Operations Review (MOR ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

LRO-LCROSS Launch Segment<br />

• Launch Services Provided by KSC<br />

• Atlas V 401 through NLS Contract<br />

• 2000 kg/C 3 ~-2.0;<br />

Sun Exclusion thru Ascent<br />

• 4m fairing; H/K data thru EELV I/F<br />

• Co-manifested with LCROSS lunar<br />

mission<br />

• Launch Site Processing at Astrotech<br />

including Fueling and Control Center<br />

LRO Atlas Fairing at Astrotech<br />

NASA’s Goddard Space Flight Center LRO Flight <strong>Operations</strong> <strong>Review</strong> (FOR) Day 1 - 24

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!