LRO Readiness – PM Perspective<br />

• The LRO TC\FLT<br />

Controllers have been<br />

operating the <strong>Orbiter</strong><br />

beginning with the<br />

board level testing of<br />

each of the LRO<br />

subsystems.<br />

• This table illustrates<br />

the depth of<br />

experience we have<br />

with the critical<br />

functions and<br />

operations of the LRO<br />

spacecraft.<br />

• We have been honing<br />

our skills in the<br />

operation of LRO<br />

throughout the entire<br />

development and I&T<br />

phase of our mission.<br />

• LRO Project<br />

Management is<br />

completely confident<br />

that we know how to fly<br />

and operate LRO.<br />

<strong>Mission</strong> Activity CPT 1 & 2 T‐Vac/Bal<br />

LRO <strong>Mission</strong> Activity Mapping to Test Activities<br />

<strong>Orbiter</strong><br />

Functional<br />

& Payload<br />

Functionals<br />

Pop &<br />

Catch<br />

Tests<br />

Sep<br />

Test MRTs ORTs<br />

LRO <strong>Orbiter</strong> Separation from Atlas X X X X X X<br />

Space Network Telemetry Acquisition X X X X X X<br />

AOS @ 2kbs ‐ DSN Goldstone X X X X<br />

AOS WS1 X X X X<br />

Post Sep Verification X X X X<br />

Transition to 128kbps telemetry X X X X X X X<br />

AOS @ DSN Madrid X X X X<br />

SSR turn on X X X X X<br />

PDE Inhibit Checks & Catbed turn on X X X X X X<br />

AOS @ USN Weilheim X X X X<br />

Solar Array Deployment X X X X<br />

High Gain Deployment X X X X<br />

Transition to Observing Mode X X X X X<br />

Thruster 1‐shots X X X X X X<br />

Delta‐H Momentum Unload X X X X X<br />

Post Sep FDF Product Update X X<br />

Generate Ephemeris & ATS Loads X X<br />

Uplink Cruise Loads to <strong>Orbiter</strong> & Start ATS X X X X X<br />

Transition to HGA Communications X X X X X<br />

GNC KF Configuration X X X X X<br />

Prelim MCC Maneuver Planning Verification X X<br />

Final MCC Manuever Planning Verification X X<br />

Load MCC‐E & MCC‐1 Manuever Plans X X<br />

Pre‐MCC‐E Config Verification X X<br />

MCC‐E Burn & Post Burn Activities X X X X<br />

Pre MCC‐1 Config Verification X X<br />

MCC‐1 Maneuver & post Burn Activities X X X X<br />

CRaTER Instrument Turn‐on Activities X X X X X<br />

LEND Instrument Turn‐on Activities X X X X X<br />

Early Cruise Mini‐Gyro Calibration X X<br />

LOI‐E & LOI‐1 Maneuver Plan Released & Tested X X<br />

Pressurize Prop Sys ‐ Open HPLV & Fire Pyros X X X X X X<br />

LOI Manuevers X X X X X<br />

Spacecraft Commissioning X X<br />

HGA Calibrations X X<br />

Gyro & ST Calibrations X X<br />

NASA’s Goddard Space Flight Center<br />

Ka‐Band Checkout<br />

S‐Band Rate Checkout<br />

X X<br />

LRO Flight <strong>Operations</strong> <strong>Review</strong> X (FOR) X<br />

X<br />

X<br />

X<br />

Day X1 - 46<br />

X<br />

X<br />

Instrument Commissioning X X X X<br />

Nominal <strong>Mission</strong> X X X X X<br />

Propulsion<br />

System<br />

Tests<br />

<strong>Mission</strong><br />

SIMs<br />

<strong>Mission</strong><br />

Rehearsals