LRO Open RFA Status<br />

RFA # Title Requester Status<br />

LRO-<strong>MOR</strong>-ADV-0002 LOI Contingency Timelines C. Jones Project responded, advisory RFA,<br />

originator plans to close at FOR<br />

LRO-<strong>Mission</strong>-PER-0006 FlatSat Fidelity C. Jones Project responded, originator<br />

requested further details<br />

LRO-<strong>Mission</strong>-PSR-ADV-0001 <strong>Mission</strong> Planning Interface Exercise C. Dent Project responded, advisory RFA,<br />

originator has concurred closure<br />

LRO-<strong>Mission</strong>-PSR-0003 Star Tracker Ram Upload Practice F. Huegel Open<br />

LRO-<strong>Mission</strong>-PSR-0005 LOLA Exercising of Redundant Laser E. Dukes Project responded, believed to be<br />

closeable<br />

LRO-<strong>Mission</strong>-PSR-0006 Contingency Procedure Development E. Dukes Project responded, believed to be<br />

closeable<br />

LRO-<strong>Mission</strong>-PSR-0007 <strong>Review</strong> Final Flight Temperature Predicts E. Powers Open, awaiting completion of final<br />

predicts by LRO Thermal<br />

LRO-<strong>Mission</strong>-PSR-0009 Titanium in Flight hardware L. Pacini Open, report in work<br />

LRO-<strong>Mission</strong>-PSR-0011 Launch, Ascent, Separation Thermal Analysis M. Bay Open, response being formulated<br />

NASA’s Goddard Space Flight Center LRO Flight <strong>Operations</strong> <strong>Review</strong> (FOR) Day 1 - 36