RISK<br />

DEFINITIONS<br />

LRO Accepted and Residual Risk Definitions<br />

RISK: A risk is any potential set of circumstances that may affect mission<br />

cost, schedule, technical performance or safety.<br />

ACCEPTED RISK: A LRO “accepted risk” is defined as a risk that the<br />

Project opts to accept on the basis of any of the criteria stated below:<br />

–The risk has been mitigated to an acceptable level as deemed by<br />

Project management (implies minimal impact to the Project if the<br />

conditions occur).<br />

–The cost/schedule/technical impact of further mitigation exceeds<br />

the perceived value of the mitigation.<br />

–The mechanisms for mitigating the risk lie outside of LRO control.<br />

–No further mitigation options are available/viable for the risk.<br />

*Note: An accepted risk may or may not be a residual risk, but continued efforts to<br />

mitigate are not deemed practical.<br />

RESIDUAL RISK: A LRO “residual risk” is any accepted risk with the<br />

capacity to affect LRO’s ability to meet Level 1 Requirements (full mission<br />

success criteria).<br />

*Note: A residual risk must always be an accepted risk. Residual risks cannot be<br />

further mitigated without undue impact to cost, schedule, or technical performance.<br />

Risk Management Process and Responsibilities<br />

Project<br />

Manager<br />

Accept<br />

(if necessary)<br />

RMB/<br />

Subsystem Leads<br />

Control<br />

Control<br />

Identify<br />

Identify<br />

Analyze<br />

Analyze<br />

Individuals<br />

and Teams<br />

Sources: NPR 8000.4 and GPR 7120.4<br />

NASA’s Goddard Space Flight Center LRO Flight <strong>Operations</strong> <strong>Review</strong> (FOR) Day 1 - 48<br />

Close<br />

Close<br />

Plan<br />

Plan<br />

Communicate<br />

& Document<br />

Track<br />

Track<br />

NASA’s Continuous Risk Management Model