22.03.2013 Views

Lunar Reconnaissance Orbiter Mission Operations Review (MOR ...

Lunar Reconnaissance Orbiter Mission Operations Review (MOR ...

Lunar Reconnaissance Orbiter Mission Operations Review (MOR ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

LRO Project Organization & Execution<br />

LRO Project Overview<br />

• Directed in-house NASA GSFC <strong>Mission</strong><br />

executed for NASA ESMD<br />

• Competitive AO for Instruments,<br />

selection on 12/23/04<br />

• In-house Spacecraft Bus & <strong>Mission</strong><br />

<strong>Operations</strong> leveraging previous and<br />

ongoing GSFC missions.<br />

• Project Funded in February 2005 and<br />

development begun in earnest.<br />

• Approximately 300 people, a mix of CS<br />

and on-site contractors, plus Instrument<br />

Teams.<br />

• Project transitions to (and retains)<br />

<strong>Mission</strong> Director role after<br />

commissioning for ESMD mission.<br />

• <strong>Mission</strong> Director role transitions from<br />

Project to GSFC SSMO for SMD<br />

extended mission. Plan being<br />

developed per 400-PG-7120.0.1<br />

– Transition Plan will include a Transition<br />

<strong>Review</strong> which will include any Flight<br />

<strong>Operations</strong> changes required by SMD.<br />

02/24/2009<br />

ACS<br />

J. Simpson<br />

C&DH<br />

Q. Nguyen<br />

Comm.<br />

A. Rodriguez<br />

Arroyo<br />

Electrical<br />

D. Duvall<br />

Project Scientist<br />

R. Vondrak<br />

Deputy 600<br />

J. Keller<br />

Science Data Mgmt.<br />

S. Scott<br />

Chief Safety and<br />

<strong>Mission</strong> Assurance300<br />

Officer<br />

R. Kolecki<br />

Deputy CSMO<br />

L. Lee<br />

EEE Parts<br />

R. Williams<br />

Manufacturing<br />

N. Virmani<br />

Materials<br />

P. Joy<br />

Quality Assurance<br />

A. Lacks<br />

NASA’s Goddard Space Flight Center LRO Flight <strong>Operations</strong> <strong>Review</strong> (FOR) Day 1 - 26<br />

Reliability<br />

L. Lee<br />

Safety<br />

J. Rezac<br />

<strong>Lunar</strong> <strong>Reconnaissance</strong> <strong>Orbiter</strong> (LRO) Project<br />

S/W Quality Assurance<br />

C. Taylor<br />

Laser Ranging<br />

R. Zellar<br />

Mechanical<br />

G. Rosanova<br />

Power<br />

T. Spitzer<br />

LRO Project Manager<br />

C. Tooley<br />

200<br />

Deputy Project Manager<br />

C. Peddie<br />

Public Affairs<br />

Deputy Project Manager /<br />

Resources<br />

100<br />

Officer<br />

N. Neal-Jones<br />

B. Sluder<br />

Admin. - P. Gregory 400<br />

600<br />

EPO Lead<br />

B. Hsu<br />

Financial<br />

Manager<br />

Vacant<br />

400<br />

<strong>Mission</strong> System Engineer (MSE) - ITA<br />

D. Everett<br />

<strong>Mission</strong> Business Mgr.<br />

J. Smith<br />

500 Deputy MSE - <strong>Mission</strong> Architecture & Design<br />

Resource Analysts<br />

V. Martinez<br />

M. Houghton<br />

Project Support<br />

Manager<br />

K. Opperhauser 400<br />

CM/DM<br />

D. Dusterwald/<br />

W. Schultzaberger<br />

EVM<br />

R. Hesenperger<br />

General Business<br />

J. Reid<br />

MIS<br />

A. Hess/J. Brill<br />

Scheduling<br />

A. Eaker<br />

Propulsion<br />

C. Zakrzwski<br />

Software<br />

M. Blau<br />

Thermal<br />

W. Ousley/C. Baker<br />

Original Signed By:<br />

Craig Tooley Date<br />

<strong>Lunar</strong> <strong>Reconnaissance</strong> <strong>Orbiter</strong> (LRO)<br />

Project Manager<br />

Deputy MSE - I&T and <strong>Operations</strong><br />

R. Saylor<br />

Avionics Systems<br />

P. Luers<br />

Contamination Ctrl.<br />

C. Lorentson<br />

Flight Dynamics<br />

M. Beckman<br />

GN&C Systems<br />

E. Holmes<br />

Mech./Thermal Sys.<br />

S. Wasserzug<br />

LEND<br />

I. Mitrofanov<br />

ISR, Moscow<br />

CRaTER<br />

H. Spence<br />

Boston University<br />

LOLA<br />

D. Smith<br />

GSFC<br />

Contracting<br />

Officer<br />

J. Janus<br />

Safing<br />

S. Andrews<br />

S/C Bus & LV Systems<br />

T. Ajluni<br />

S/C Sys. & Verification<br />

M. Pryzby<br />

SW/HW Systems<br />

C. Wildermann<br />

Systems Analysis<br />

L. Hartz<br />

Spacecraft<br />

<strong>Orbiter</strong><br />

Launch Vehicle Ground Systems Payload Systems<br />

Bus<br />

I & T Lead<br />

Manager<br />

& <strong>Operations</strong><br />

Manager<br />

T. Ajluni 500 J. Baker 500<br />

T. Jones 400<br />

R. Saylor 400<br />

A. Bartels 400<br />

GS&O Deputy<br />

TBD<br />

MOT Lead<br />

Payload Systems<br />

Engineers<br />

500<br />

J. Murphy<br />

GS&O System Engr.<br />

J. Cerullo<br />

L. Hartz<br />

J. Clapsadle<br />

M. Reden<br />

Diviner<br />

D. Paige<br />

UCLA<br />

LROC<br />

M. Robinson<br />

Arizona State Univ.<br />

LAMP<br />

R. Gladstone<br />

SWRI<br />

431-REF-000223<br />

Mini - RF<br />

S. Nozette<br />

ACT

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!