- Page 1 and 2: NASA’s Goddard Space Flight Cente
- Page 3 and 4: Agenda: Day One (March 11, 2009) GS
- Page 5 and 6: MOR Review Board Review Panel Membe
- Page 7 and 8: FOR Guidelines vs Topic Coverage FO
- Page 9 and 10: Review Logistics • Review package
- Page 11 and 12: FD Flight Dynamics FDF Flight Dynam
- Page 13 and 14: NAIF Navigation and Ancillary Infor
- Page 15 and 16: Project Overview LRO Flight Operati
- Page 17 and 18: LRO Mission Objectives Locate Poten
- Page 19 and 20: Orbiter LRO Mission Segment Definit
- Page 21 and 22: LRO Reserves & Margin LRO Reserves
- Page 23 and 24: LRO Instruments and Investigations
- Page 25 and 26: LRO at Astrotech Building 2 North N
- Page 27 and 28: LRO Top Level Schedule Ver. 17B Pro
- Page 29 and 30: LRO Path to Launch - Key Upcoming E
- Page 31 and 32: LRO Overall Status - Project Perspe
- Page 33 and 34: LRO Flight Operations Status - Proj
- Page 35 and 36: LRO Review History & RFA Summary Re
- Page 37 and 38: L I K E L I H O O D 5 4 3 2 1 8 CON
- Page 39 and 40: LRO Open Risks LRO Risk: Suspect Pa
- Page 41 and 42: LRO Open Risks LRO Risk: LOI Missio
- Page 43 and 44: LRO Open Risks LRO Risk: FAA Potent
- Page 45 and 46: LRO Open Risks LRO Risk: DMS Develo
- Page 47 and 48: Project & Mission Overview Backup S
- Page 49: C O N S E Q U E N C E Criticality L
- Page 53 and 54: LRO Project Residual Risks (3 of 5)
- Page 55 and 56: LRO Project Residual Risks (5 of 5)
- Page 57 and 58: LRO Dimensional Layout (Deployed) N
- Page 59 and 60: Mission Overview LRO Flight Operati
- Page 61 and 62: Level 1 Success Criteria Full Missi
- Page 63 and 64: Spacecraft Overview INSTRUMENT MODU
- Page 65 and 66: Mission Trajectory / Orbits Overvie
- Page 67 and 68: 1 Initial Sun Acquisition Time Crit
- Page 69 and 70: The Moon-Centered Universe • Twic
- Page 71 and 72: Lunar Eclipses: 2009-2013 Date Type
- Page 73 and 74: Extended Mission Options • Up to
- Page 75 and 76: Flight Rules Overview • Flight Ru
- Page 77 and 78: Flight Rules (2) No Rule ID System
- Page 79 and 80: Flight Rules (4) No Rule ID System
- Page 81 and 82: Flight Rules (6) LRO Mission Flight
- Page 83 and 84: MGS Failure Report Recommendations
- Page 85 and 86: Training MGS Failure Report Recomme
- Page 87 and 88: GS&O Overview • Space Communicati
- Page 89 and 90: GS&O Review History • GS&O Review
- Page 91 and 92: GS Accomplishments Since MOR • Wh
- Page 93 and 94: LRO Mission Operations Facilities M
- Page 95 and 96: Key Documentation Status (2) Docume
- Page 97 and 98: Ground System Freeze Plan • Opera
- Page 99 and 100: Space Communications Network (SCN)
- Page 101 and 102:
Networks Documentation & Reviews
- Page 103 and 104:
SN Support Summary • The SN shall
- Page 105 and 106:
USN Overview NASA’s Goddard Space
- Page 107 and 108:
USN Overview • Four Ground Statio
- Page 109 and 110:
DSN Overview NASA’s Goddard Space
- Page 111 and 112:
Deep Space Network Overview NASA’
- Page 113 and 114:
WS1 Overview NASA’s Goddard Space
- Page 115 and 116:
WS1 2KW HPA Installation • The or
- Page 117 and 118:
WS1 Key Performance Parameters # Pa
- Page 119 and 120:
WS1 Requirements • The NEN shall
- Page 121 and 122:
Space Communications Network Networ
- Page 123 and 124:
Networks Scheduling Tests to Date
- Page 125 and 126:
Laser Ranging Overview • Laser Ra
- Page 127 and 128:
Primary Laser Ranging Ground System
- Page 129 and 130:
• Status Laser Ranging Scheduling
- Page 131 and 132:
Agenda • Security Organizational
- Page 133 and 134:
Responsibilities of the LRO ISSO fo
- Page 135 and 136:
Project Element Status Project Elem
- Page 137 and 138:
Summary • All LRO MOC IT security
- Page 139 and 140:
MOC Overview • The Mission Operat
- Page 141 and 142:
Facility Overview • All Facilitie
- Page 143 and 144:
MOC Facility NASA’s Goddard Space
- Page 145 and 146:
MOC Hardware • All MOC hardware h
- Page 147 and 148:
MOC Software • All MOC software h
- Page 149 and 150:
MOC Level 4 Requirements Verificati
- Page 151 and 152:
Discrepancy Report Status Subsystem
- Page 153 and 154:
Critical and Significant Discrepanc
- Page 155 and 156:
Critical and Significant Discrepanc
- Page 157 and 158:
MOC Sustaining Engineering Plan •
- Page 159 and 160:
MOC Readiness Backup Slides NASA’
- Page 161 and 162:
Level 4 Verification Summary L4 Req
- Page 163 and 164:
Level 4 Verification Summary L4 Req
- Page 165 and 166:
Level 4 Verification Summary L4 Req
- Page 167 and 168:
Level 4 Verification Summary L4 Req
- Page 169 and 170:
Level 4 Verification Summary L4 Req
- Page 171 and 172:
SOAR Summary SOAR ID Anomaly Title
- Page 173 and 174:
SOAR Summary SOAR ID Anomaly Title
- Page 175 and 176:
SOAR Summary SOAR ID Anomaly Title
- Page 177 and 178:
SOAR Summary SOAR ID Anomaly Title
- Page 179 and 180:
SOAR Summary SOAR ID Anomaly Title
- Page 181 and 182:
SOAR Summary SOAR ID Anomaly Title
- Page 183 and 184:
Software Inventory & Sustaining Pla
- Page 185 and 186:
Software Inventory & Sustaining Pla
- Page 187 and 188:
Mission Operations Center Readiness
- Page 189 and 190:
• Sensors AGS-Centric Spacecraft
- Page 191 and 192:
AGS Requirements Updates Since MOR
- Page 193 and 194:
LRO AGS Overview NASA’s Goddard S
- Page 195 and 196:
AGS Software Modifications/Addition
- Page 197 and 198:
Operations Concept • Launch throu
- Page 199 and 200:
Attitude Maneuver Support Plan •
- Page 201 and 202:
Attitude Determination • Real-Tim
- Page 203 and 204:
AGS Team Training Plan • AGS Team
- Page 205 and 206:
MOT Training Plan and Responsibilit
- Page 207 and 208:
AGS Team Training Status LRO AGS Su
- Page 209 and 210:
Issues/Risks/Future Work • Issues
- Page 211 and 212:
AGS Requirements (1 of 3) ID Descri
- Page 213 and 214:
AGS Requirements (3 of 3) ID Descri
- Page 215 and 216:
LRO AGS Input Products and Status I
- Page 217 and 218:
Mission Operations Center Readiness
- Page 219 and 220:
Operations Product Development Over
- Page 221 and 222:
Flight Procedures Summary • Fligh
- Page 223 and 224:
Project Database • Project Databa
- Page 225 and 226:
MOT Certification • MOT Certifica
- Page 227 and 228:
MOT Certification - Plan Forward
- Page 229 and 230:
Backup Slides - FPD’s In-Work NAS
- Page 231 and 232:
Agenda • Flight Dynamics Overview
- Page 233 and 234:
Pre-Launch Support • LRO will be
- Page 235 and 236:
Launch Window • Current launch da
- Page 237 and 238:
Lunar Orbit Insertion • The Lunar
- Page 239 and 240:
Contingency Planning • Three crit
- Page 241 and 242:
FDF Support from Building 28 NASA
- Page 243 and 244:
FDF Software Status • Navigation
- Page 245 and 246:
External Product Testing • All ex
- Page 247 and 248:
Maneuver Team Status LRO Flight Ope
- Page 249 and 250:
FlatSat Simulation LRO Maneuver Pla
- Page 251 and 252:
Maneuver Team Training • Supporte
- Page 253 and 254:
Maneuver Team Readiness • Maneuve
- Page 255 and 256:
Orbit Team Status LRO Flight Operat
- Page 257 and 258:
Orbit Team Staffing Plan • From L
- Page 259 and 260:
Orbit Team Readiness • Orbit Team
- Page 261 and 262:
Tracking Station Certification •
- Page 263 and 264:
WS1 Certification Results • Rangi
- Page 265 and 266:
Flight Dynamics Status Summary LRO
- Page 267 and 268:
FDF Backup Material NASA’s Goddar
- Page 269 and 270:
Maneuver Product Deliveries Maneuve
- Page 271 and 272:
Detailed Timeline for MCC and LOI C
- Page 273 and 274:
Agenda • LRO Data Communications
- Page 275 and 276:
LRO Mission Data Flows NASA’s God
- Page 277 and 278:
Voice Communications • All voice
- Page 279 and 280:
Summary • All data communications
- Page 281 and 282:
Data Communications NASA’s Goddar
- Page 283 and 284:
Overview of ASO Data Transports NAS
- Page 285 and 286:
Science Data Management Overview LR
- Page 287 and 288:
Data Delivery Plan SOCs deliver 3-6
- Page 289 and 290:
SOC - PDS Testing Archive Test 1: I
- Page 291 and 292:
Summary • SOCs’ Documentation D
- Page 293 and 294:
Agenda - Mini-RF SOC • SOC Functi
- Page 295 and 296:
Peer Review Status Review Level Dat
- Page 297 and 298:
FTE's 3.50 3.00 2.50 2.00 1.50 1.00
- Page 299 and 300:
LRO MOC Command Generation Process
- Page 301 and 302:
LRO MOC Telemetry Processing Instru
- Page 303 and 304:
SOC Internet To External Users SOC
- Page 305 and 306:
Operations Systems / Data Flows P D
- Page 307 and 308:
• SOC software Sustaining Enginee
- Page 309 and 310:
Testing Requirements Verification M
- Page 311 and 312:
Testing Requirements Verification M
- Page 313 and 314:
Testing Requirements Verification M
- Page 315 and 316:
Testing Requirements Verification M
- Page 317 and 318:
Testing Requirements Verification M
- Page 319 and 320:
Summary • Mini-RF SOC software de
- Page 321 and 322:
Abbreviations and Acronyms APL Appl
- Page 323 and 324:
Day in the Life for Planning & Comm
- Page 325 and 326:
CRaTER Science Operations LRO Fligh
- Page 327 and 328:
CRaTER Science Operations • SOC F
- Page 329 and 330:
CRaTER Science Operations • SOC F
- Page 331 and 332:
CRaTER SOC Operations Concept Staff
- Page 333 and 334:
CRaTER SOC Operations Concept SOC O
- Page 335 and 336:
CRaTER SOC Operations Concept Manua
- Page 337 and 338:
CRaTER SOC Operations Concept SOC F
- Page 339 and 340:
CRaTER Ops Room: public display sys
- Page 341 and 342:
CRaTER SOC Operations Concept SOC F
- Page 343 and 344:
CRaTER SOC Operations Concept Ops S
- Page 345 and 346:
CRaTER SOC Operations Concept Ops S
- Page 347 and 348:
CRaTER Science Operations • SOC F
- Page 349 and 350:
CRaTER SOC Readiness Sustaining Eng
- Page 351 and 352:
CRaTER SOC Readiness Requirements V
- Page 353 and 354:
CRaTER SOC Readiness Requirements V
- Page 355 and 356:
CRaTER SOC Readiness Requirements V
- Page 357 and 358:
CRaTER SOC Readiness Requirements V
- Page 359 and 360:
CRaTER SOC Summary • CRaTER SOC h
- Page 361 and 362:
CRaTER SOC Operations Concept Ops S
- Page 363 and 364:
SOC Readiness Requirements Verifica
- Page 365 and 366:
SOC Readiness Requirements Verifica
- Page 367 and 368:
SOC Readiness Requirements Verifica
- Page 369 and 370:
CRaTER SOC Operations Concept Ops S
- Page 371 and 372:
CRaTER SOC Operations Concept Ops S
- Page 373 and 374:
CRaTER SOC Development Status Softw
- Page 375 and 376:
CRaTER SOC Development Status Softw
- Page 377 and 378:
DLRE Science Operations LRO Flight
- Page 379 and 380:
DLRE SOC Peer Review Status LRO Sin
- Page 381 and 382:
DLRE SOC Organization Chart Mark Su
- Page 383 and 384:
JPL SOC DLRE SOC Staffing Status
- Page 385 and 386:
DLRE SOC Data Flows/Interfaces DLRE
- Page 387 and 388:
DLRE SOC Facilities - UCLA Rocks Fr
- Page 389 and 390:
DLRE SOC Readiness NASA’s Goddard
- Page 391 and 392:
DLRE SOC SW Development Status UCLA
- Page 393 and 394:
JPL SOC Plans DLRE SOC Sustaining E
- Page 395 and 396:
DLRE SOC Concerns & Risks Concern R
- Page 397 and 398:
DLRE SOC Requirements Verification
- Page 399 and 400:
DLRE SOC Requirements Verification
- Page 401 and 402:
DLRE SOC Requirements Verification
- Page 403 and 404:
DLRE SOC Requirements Verification
- Page 405 and 406:
DLRE SOC Requirements Verification
- Page 407 and 408:
DLRE SOC Requirements Verification
- Page 409 and 410:
LEND SOC LRO Flight Operations Revi
- Page 411 and 412:
SOC Peer Review Status • Peer rev
- Page 413 and 414:
SOC Staffing • SOC Organization C
- Page 415 and 416:
SOC Operations Concept Overview •
- Page 417 and 418:
SOC Operations Concept Institute fo
- Page 419 and 420:
SOC Operations Concept Overview •
- Page 421 and 422:
SOC Commanding • LEND is a passiv
- Page 423 and 424:
LEND Query Tool Institute for Space
- Page 425 and 426:
LEND Query Tool Institute for Space
- Page 427 and 428:
LEND Quick Look Visualizer Institut
- Page 429 and 430:
Requirement ID (From LEND SRD) LEND
- Page 431 and 432:
LEND_FN_026 LEND_FN_027 LEND_FN_030
- Page 433 and 434:
LEND_IF_011 LEND_IF_015 LEND_IF_020
- Page 435 and 436:
Summary • All elements of all LEN
- Page 437 and 438:
SOC Commanding Command code Command
- Page 439 and 440:
SOC Commanding Command Request Form
- Page 441 and 442:
LOLA SOC: Presentation Outline •
- Page 443 and 444:
Operations Concept: Staffing Plan
- Page 445 and 446:
Operations Concept: Ops Activities
- Page 447 and 448:
Operations Concept: SOC Facilities
- Page 449 and 450:
Data flow: Laser Fires Laser Rangin
- Page 451 and 452:
SOC Readiness: Software/Tools • E
- Page 453 and 454:
SOC Readiness: Software/Tools cntd.
- Page 455 and 456:
SOC Readiness: Sustaining Eng - FSW
- Page 457 and 458:
Summary • The LOLA SOC facility e
- Page 459 and 460:
SOC Readiness: Requir. Ver. pt 1 na
- Page 461 and 462:
SOC Readiness: Requir. Ver. pt 3 na
- Page 463 and 464:
SOC Functions • Monitor LAMP inst
- Page 465 and 466:
Staffing Plan FTE Level 1.5 1 0.5 0
- Page 467 and 468:
Automated Operations Activities •
- Page 469 and 470:
Manual Operations Activities: Speci
- Page 471 and 472:
SOC Network • Data are transferre
- Page 473 and 474:
Software/Tools SW Component Name Fu
- Page 475 and 476:
Instrument FSW Maintenance Plans
- Page 477 and 478:
Issues / Concerns • Full ETE Flig
- Page 479 and 480:
Summary • LAMP SOC Design Peer Re
- Page 481 and 482:
LROC Science Operations Center LRO
- Page 483 and 484:
SOC Peer Reviews • November 27, 2
- Page 485 and 486:
Staffing Plan • Early Mission (La
- Page 487 and 488:
SOC Uplink Operations • Weekly te
- Page 489 and 490:
LROC Observation Targeting (cont.)
- Page 491 and 492:
SOC Downlink Operations • Weekly
- Page 493 and 494:
Engineering Data Record (EDR) Gener
- Page 495 and 496:
Reduced Data Record (RDR) Generatio
- Page 497 and 498:
RDR Generation - NAC • CTX mosaic
- Page 499 and 500:
SOC Facilities (cont.) • Interdis
- Page 501 and 502:
SOC Readiness - Documentation Docum
- Page 503 and 504:
SOC Readiness - Software/Hardware
- Page 505 and 506:
SOC Readiness - Sustaining Engineer
- Page 507 and 508:
• Functional SOC Requirements Ver
- Page 509 and 510:
LROC SOC Backup Slides NASA’s God
- Page 511 and 512:
• Approach 1 Apollo Panoramic Re-
- Page 513 and 514:
LROC Public Interface for Target Su
- Page 515 and 516:
Test Effort to Date • Mission Rea
- Page 517 and 518:
Significant Accomplishments Since M
- Page 519 and 520:
Documentation Status (2) • LRO Mi
- Page 521 and 522:
Ops Data Product Verification Summa
- Page 523 and 524:
Internal Product Verification Summa
- Page 525 and 526:
MRT Definitions • All requirement
- Page 527 and 528:
Requirements Verification Summary -
- Page 529 and 530:
Requirements Verification Summary -
- Page 531 and 532:
Requirements Verification Summary -
- Page 533 and 534:
Requirements Verification Summary -
- Page 535 and 536:
Remaining Work (2) • Verify all r
- Page 537 and 538:
Launch and Early Mission Operations
- Page 539 and 540:
Launch Countdown Overview • Atlas
- Page 541 and 542:
LRO Launch Day Configuration Proced
- Page 543 and 544:
LRO Early Mission Roles KSC Locatio
- Page 545 and 546:
Launch Commit Criteria LRO Launch C
- Page 547 and 548:
Early Mission Timeline • Early Mi
- Page 549 and 550:
Atlas V Flight Profile NASA’s God
- Page 551 and 552:
Separation Activities • Spacecraf
- Page 553 and 554:
Initial Acquisition Coverage Detail
- Page 555 and 556:
LRO Post-Separation Power NASA’s
- Page 557 and 558:
MCC Planning Overview Pre-Burn Acti
- Page 559 and 560:
LOI - 1 Maneuver Details • Plan t
- Page 561 and 562:
LOI-1 Restart Flow • LOI Restart
- Page 563 and 564:
Spacecraft Commissioning Overview
- Page 565 and 566:
Instrument Commissioning Overview
- Page 567 and 568:
Instrument Commissioning Overview(2
- Page 569 and 570:
Early Mission Staffing LRO Early Mi
- Page 571 and 572:
Early Mission Planning and Coordina
- Page 573 and 574:
Early Mission Planning Process Comm
- Page 575 and 576:
Road to Launch • Finalize Early M
- Page 577 and 578:
Key Operational Drivers • Perform
- Page 579 and 580:
Mission Operations NASA’s Goddard
- Page 581 and 582:
• Purpose Recorder Model - Assist
- Page 583 and 584:
State Vector & Lunar Ephemeris Gene
- Page 585 and 586:
Daily Schedule Generation • Inges
- Page 587 and 588:
ATS and Pass Script Review & Signat
- Page 589 and 590:
Operations Activity Requests • Re
- Page 591 and 592:
Real-Time Operations Overview • N
- Page 593 and 594:
Orbiter Health & Safety Monitoring
- Page 595 and 596:
Routine Operations Activities • C
- Page 597 and 598:
HK & Science Data Downlink • Reco
- Page 599 and 600:
Trending and Data Analysis • MOT
- Page 601 and 602:
MOC Automation • Automation of re
- Page 603 and 604:
Lights Out Detection and Notificati
- Page 605 and 606:
File Accountability and Tracking
- Page 607 and 608:
DMS - Web Portal • Web Portal for
- Page 609 and 610:
SCN Scheduling • Single schedule
- Page 611 and 612:
Weekly Planning Meetings • Expect
- Page 613 and 614:
Monthly Calibrations • During the
- Page 615 and 616:
Scenario 1 Station Keeping Maneuver
- Page 617 and 618:
Delta-H & Yaw Maneuvers • Momentu
- Page 619 and 620:
Laser Ranging MOT Operations • MO
- Page 621 and 622:
RTS Load Generation • Orbiter has
- Page 623 and 624:
• Maneuvers R/T Ops - Other Norma
- Page 625 and 626:
• Spacecraft Orbiter Configuratio
- Page 627 and 628:
Memory Model Updates • Tracks loa
- Page 629 and 630:
Memory Model - Sample Report NASA
- Page 631 and 632:
LRO FSW and Instrument FSW Updates
- Page 633 and 634:
Contingency Preparations LRO Flight
- Page 635 and 636:
On-Board Safing Monitoring NASA’s
- Page 637 and 638:
LRO Syst em Level Cont ingencies Co
- Page 639 and 640:
LRO Syst em Level Cont ingencies Co
- Page 641 and 642:
Start Is the SC power positive (ona
- Page 643 and 644:
LOI Robustness • LOI-1 is ~ 4-5 d
- Page 645 and 646:
Mission System & Operations Testing
- Page 647 and 648:
Test Definitions Test Type Purpose
- Page 649 and 650:
Mission Simulations & Rehearsals
- Page 651 and 652:
Mission Simulations Summary NASA’
- Page 653 and 654:
Open Actions Summary • Action ite
- Page 655 and 656:
SIM ‐ 14 SIM ‐ 21 LOI Contingen
- Page 657 and 658:
Countdown Type Launch Countdown Tes
- Page 659 and 660:
Operations Readiness Test Details
- Page 661 and 662:
ORT Tests to Date Event ID Descript
- Page 663 and 664:
Flatsat Test Bed Diagram NASA’s G
- Page 665 and 666:
Summary • End-to-End testing perf
- Page 667 and 668:
FSW Status Update • FSW Build Ver
- Page 669 and 670:
FSW Errata and Constraints • LEND
- Page 671 and 672:
• LRO FlatSat Sustaining Engineer
- Page 673 and 674:
• Pre-launch FSSE Team Roles/Resp
- Page 675 and 676:
FSW Update Processes Potential Enha
- Page 677 and 678:
• FSSE CCB Transition Plan - Auth
- Page 679 and 680:
Mission Assurance Assessment LRO Fl
- Page 681 and 682:
LRO GS&O Safety & Mission Assurance
- Page 683 and 684:
IV&V Summary • IV&V conducted ris
- Page 685 and 686:
LRO GS&O Review Requirements • As
- Page 687 and 688:
LRO Readiness - PM Perspective •