Revised <strong>Mission</strong> Ops Plan Forward<br />

LRO <strong>Mission</strong> Op Overview Plan<br />

Activity<br />

Finalize TVAC<br />

CPT‐2<br />

STOL Procedures<br />

develop<br />

checkout/test<br />

finalize<br />

1<br />

January<br />

2 3 4 1<br />

February<br />

2 3 4 1<br />

March<br />

2 3 4 1<br />

April<br />

2 3 4 1<br />

May<br />

2 3 4<br />

Flight Procedures Document<br />

develop<br />

finalize and review<br />

Draft Release<br />

Baseline<br />

Contingency Procedures Document<br />

develop<br />

finalize and review<br />

Ops Documentation<br />

Flight <strong>Operations</strong> Plan<br />

Launch & Early Msn Hdbk<br />

Flight Rules<br />

<strong>Operations</strong> Agreements<br />

Launch Early Msn Team document<br />

S/C User Guide<br />

Instrument User Guides (from all)<br />

GS&O Launch Coutdown Script<br />

<strong>Mission</strong> Timelines<br />

update releases<br />

MRT Testing<br />

complete MRT #3<br />

complete MRT #6<br />

ORT Testing<br />

USN retest<br />

MOC SW verficiation<br />

All Drafts Submit Final Drafts Submit<br />

ITOS<br />

DMS<br />

ITPS<br />

MPS<br />

AGS<br />

Simulations<br />

LRO‐SIM‐09 (Reserve)<br />

LRO‐SIM‐25 (Integrated Launch Sim)<br />

LRO‐SIM‐14 (LOI‐1 Contingencies)<br />

LRO‐SIM‐28 (Early Msn w/contingencies)<br />

LRO‐SIM‐21 (LOI Contingencies)<br />

LRO‐SIM‐15 (Early Msn w/contingencies)<br />

LRO‐SIM‐24 (Early Msn w/contingencies)<br />

LRO‐SIM‐19 (Spacecraft Contingency Testng)<br />

LRO‐SIM‐13 (Instr Calibration)<br />

LRO‐SIM‐26 (Nominal Ops)<br />

LRO‐SIM‐06 (LOI Contingencies)<br />

LRO‐SIM‐22 (Instr Calibration)<br />

LRO‐SIM‐23 (Integrated Launch Sim)<br />

Rehearsals<br />

MR#4 ‐ Nominal Ops<br />

MR#5 ‐ Launch to LOI<br />

MR#3 ‐ <strong>Lunar</strong> Orbit Acq & S/C Commissioning<br />

Flight Ops <strong>Review</strong><br />

Coordination w/external org<br />

ETE Test w/SOCs<br />

preparation, dry runs, etc<br />

review<br />

Draft Slides<br />

Dry Run<br />

Final Slides<br />

Pre‐ship <strong>Review</strong><br />

FOR<br />

preparation<br />

review<br />

PSR<br />

ship S/C<br />

<strong>Review</strong>s<br />

Launch<br />

Early <strong>Mission</strong><br />

Commissioning<br />

Ship LRO S/C<br />

Flt Cntler TIM<br />

MRR? LRR?<br />

<strong>Orbiter</strong> 'offline' 1 week for ship to KSC 4/5 last day to access 4/22 LRO fueling 4/28 LRO mate to PLA,<br />

NASA’s Goddard Space Flight Center orbiter<br />

LCROSS<br />

LRO Flight <strong>Operations</strong> <strong>Review</strong> (FOR) Day 1 - 34

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!