26.03.2013 Views

Sustainable Construction - Building & Construction Authority

Sustainable Construction - Building & Construction Authority

Sustainable Construction - Building & Construction Authority

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>Sustainable</strong> <strong>Construction</strong> -<br />

Materials like timber can be used as external wall systems provided that the external wall<br />

is situated 1 m or more from the relevant boundary and the building does not exceed 15 m in<br />

height. The setback of 1 m or more from the boundary is to prevent fire spreading from one building<br />

to another.<br />

Designers who intend to use any form of plastic material as external walls system would need to seek<br />

approval from the Relevant <strong>Authority</strong>.<br />

Distance of<br />

external wall<br />

from boundary<br />

is more than 1m<br />

Residential building not<br />

exceeding 3 storeys<br />

Boundary Line<br />

This relaxation of rule comes with a condition:<br />

The external walls must be provided with minimum period of 15 minutes<br />

insulation (method of fire exposure - from inside the building) under BS<br />

476: Parts 20 to 23.<br />

34<br />

Wooden louvres at external wall allowed for buildings<br />

< 15 m in height and the external wall 1 m or more<br />

from boundary

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!