Sustainable Construction - Building & Construction Authority
Sustainable Construction - Building & Construction Authority
Sustainable Construction - Building & Construction Authority
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Cementitious spray-fi reproofi ng<br />
BEFORE<br />
<strong>Sustainable</strong> <strong>Construction</strong> -<br />
AFTER<br />
52<br />
Installation of trades such as clips,<br />
hangars, support sleeves, and<br />
other attachments which are<br />
required to penetrate the fireproofing<br />
should be done BEFORE<br />
the application of the fireproofing<br />
material.<br />
Installation of services such as<br />
ducts, piping, equipment or<br />
other suspended items should<br />
be done AFTER the fi reproofi ng is<br />
completed and inspected.