26.03.2013 Views

Sustainable Construction - Building & Construction Authority

Sustainable Construction - Building & Construction Authority

Sustainable Construction - Building & Construction Authority

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Cementitious spray-fi reproofi ng<br />

BEFORE<br />

<strong>Sustainable</strong> <strong>Construction</strong> -<br />

AFTER<br />

52<br />

Installation of trades such as clips,<br />

hangars, support sleeves, and<br />

other attachments which are<br />

required to penetrate the fireproofing<br />

should be done BEFORE<br />

the application of the fireproofing<br />

material.<br />

Installation of services such as<br />

ducts, piping, equipment or<br />

other suspended items should<br />

be done AFTER the fi reproofi ng is<br />

completed and inspected.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!