3 Installation<br />
12<br />
Drive shaft for trolley drive (trolley KE-S76)<br />
The drive shaft is suitable for girder flange widths "B" from 124 to ≤220, >221 to ≤400<br />
<strong>and</strong> >401 to 500 mm; see table 2, page 11 for length "L".<br />
Insert drive shaft (5) into the two drive pinions (6) from the counterweight side,<br />
then assemble spacer tube (7) <strong>and</strong> adjusting ring (8).<br />
Adjust drive shaft (5) so that on the hoist side the shaft end projects by between<br />
"min. 0 mm" <strong>and</strong> "max. 120 mm" beyond the drive pinion (6) <strong>and</strong> on the<br />
counterweight side the shaft end projects by between "min. 48 mm" <strong>and</strong> "max. 160<br />
mm" beyond the trolley side cheek (10).<br />
Lock adjusting ring (8) with adjusting screw so that on spacer tube (7) lying against<br />
drive pinion (6) there is a play of approx. "3 mm" to adjusting ring (8).<br />
After fitting travel drive, check drive shaft (5) for ease of movement.<br />
For dimensions B, c, f/2, x <strong>and</strong> y see tables 1 <strong>and</strong> 2, page 11<br />