3 Installation<br />

12<br />

Drive shaft for trolley drive (trolley KE-S76)<br />

The drive shaft is suitable for girder flange widths "B" from 124 to ≤220, >221 to ≤400<br />

<strong>and</strong> >401 to 500 mm; see table 2, page 11 for length "L".<br />

Insert drive shaft (5) into the two drive pinions (6) from the counterweight side,<br />

then assemble spacer tube (7) <strong>and</strong> adjusting ring (8).<br />

Adjust drive shaft (5) so that on the hoist side the shaft end projects by between<br />

"min. 0 mm" <strong>and</strong> "max. 120 mm" beyond the drive pinion (6) <strong>and</strong> on the<br />

counterweight side the shaft end projects by between "min. 48 mm" <strong>and</strong> "max. 160<br />

mm" beyond the trolley side cheek (10).<br />

Lock adjusting ring (8) with adjusting screw so that on spacer tube (7) lying against<br />

drive pinion (6) there is a play of approx. "3 mm" to adjusting ring (8).<br />

After fitting travel drive, check drive shaft (5) for ease of movement.<br />

For dimensions B, c, f/2, x <strong>and</strong> y see tables 1 <strong>and</strong> 2, page 11<br />